HTS Heading 4807

Composite paper and paperboard (made by sticking flat layers of paper or paperboard together with an adhesive), not surface-coated or impregnated, whether or not internally reinforced, in rolls or sheets

All 4 HTS codes under heading 4807 (composite paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4807

  • 4807.00 Composite paper and paperboard (made by sticking flat layers of paper or paperboard together with an adhesive), not surface-coated or impregnated, whether or not internally reinforced, in rolls or sheets.
  • 4807.00.10.00 Paper and paperboard, laminated internally with bitumen, tar or asphalt (kg): General Free; Special none; Column 2 30%.
  • 4807.00.91.00 Straw paper and paperboard, whether or not covered with paper other than straw paper (kg): General Free; Special none; Column 2 30%.
  • 4807.00.92.00 Cloth-lined or reinforced paper (kg): General Free; Special none; Column 2 22.5%.
  • 4807.00.94.00 Other (under: Other) (kg): General Free; Special none; Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.