HTS Heading 4808

Paper and paperboard, corrugated (with or without glued flat surface sheets), creped, crinkled, embossed or perforated, in rolls or sheets, other than paper of the kind described in heading 4803

All 5 HTS codes under heading 4808 (paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4808

  • 4808 Paper and paperboard, corrugated (with or without glued flat surface sheets), creped, crinkled, embossed or perforated, in rolls or sheets, other than paper of the kind described in heading 4803.
  • 4808.10.00.00 Corrugated paper and paperboard, whether or not perforated (kg): General Free; Special none; Column 2 30%.
  • 4808.40.00.00 Kraft paper, creped or crinkled, whether or not embossed or perforated (kg): General Free; Special none; Column 2 36%.
  • 4808.90 Other (under: Paper and paperboard, corrugated (with or without glued flat surface sheets), creped, crinkled, embossed or perforated, in rolls or sheets, other than paper of the kind described in heading 4803).
  • 4808.90.20.00 Creped or crinkled (under: Other) (kg): General Free; Special none; Column 2 36%.
  • 4808.90.40.00 Embossed (under: Other) (kg): General Free; Special none; Column 2 18.5%.
  • 4808.90.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.