HTS Heading 4809

Carbon paper, self-copy paper and other copying or transfer papers (including coated or impregnated paper for duplicator stencils or offset plates), whether or not printed, in rolls or sheets

All 7 HTS codes under heading 4809 (carbon paper), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4809

  • 4809 Carbon paper, self-copy paper and other copying or transfer papers (including coated or impregnated paper for duplicator stencils or offset plates), whether or not printed, in rolls or sheets.
  • 4809.20 Self-copy paper (under: Carbon paper, self-copy paper and other copying or transfer papers (including coated or impregnated paper for duplicator stencils or offset plates), whether or not printed, in rolls or sheets).
  • 4809.20.20.00 Writing paper (under: Self-copy paper) (kg): General Free; Special none; Column 2 35%.
  • 4809.20.40.00 Other (under: Self-copy paper) (kg): General Free; Special none; Column 2 25%.
  • 4809.90 Other (under: Carbon paper, self-copy paper and other copying or transfer papers (including coated or impregnated paper for duplicator stencils or offset plates), whether or not printed, in rolls or sheets).
  • 4809.90.20.00 Stereotype-matrix board and mat (kg): General Free; Special none; Column 2 35%.
  • 4809.90.40.00 Simplex (under: Decalcomania paper) (kg): General Free; Special none; Column 2 15%.
  • 4809.90.60.00 Duplex (under: Decalcomania paper) (kg): General Free; Special none; Column 2 Free.
  • 4809.90.71.00 Impregnated, coated or both, but not otherwise treated (kg): General Free; Special none; Column 2 25%.
  • 4809.90.80.00 Other (under: Other) (kg): General Free; Special none; Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.