HTS Heading 5101
Wool, not carded or combed
All 34 HTS codes under heading 5101 (wool, not carded or combed), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.3%, some per unit.
Every line of heading 5101
- 5101 Wool, not carded or combed.
- 5101.11 Shorn wool (under: Greasy, including fleece-washed wool).
- 5101.11.10.00 Wool for special uses (under: Unimproved wool; other wool, not finer than 46s) (cy kg, kg): General Free; Special none; Column 2 Free, under bond.
- 5101.11.20.00 Unimproved wool; other wool, not finer than 40s (cy kg, kg): General Free; Special none; Column 2 55.1¢/clean kg.
- 5101.11.40.00 Other wool, finer than 40s but not finer than 44s (cy kg, kg): General Free; Special none; Column 2 66.1¢/clean kg.
- 5101.11.50.00 Other wool, finer than 44s (under: Other) (cy kg, kg): General Free; Special none; Column 2 77.2¢/clean kg.
- 5101.11.60 Other (under: Shorn wool): General 18.7¢/clean kg; Special Free (AU,BH, CL,CO,E,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.2¢/clean kg.
- 5101.11.60.30 Not finer than 58s (under: Other) (cy kg, kg).
- 5101.11.60.60 Finer than 58s (under: Other) (cy kg, kg).
- 5101.19 Other (under: Greasy, including fleece-washed wool).
- 5101.19.10.00 Wool for special uses (under: Unimproved wool; other wool, not finer than 46s) (cy kg, kg): General Free; Special none; Column 2 Free, under bond.
- 5101.19.20.00 Unimproved wool; other wool, not finer than 40s (cy kg, kg): General Free; Special none; Column 2 55.1¢/clean kg.
- 5101.19.40.00 Other wool, finer than 40s but not finer than 44s (cy kg, kg): General Free; Special none; Column 2 66.1¢/clean kg.
- 5101.19.50.00 Other wool, finer than 44s (under: Other) (cy kg, kg): General Free; Special none; Column 2 77.2¢/clean kg.
- 5101.19.60 Other (under: Other): General 18.7¢/clean kg; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/clean kg.
- 5101.19.60.30 Not finer than 58s (under: Other) (cy kg, kg).
- 5101.19.60.60 Finer than 58s (under: Other) (cy kg, kg).
- 5101.21 Shorn wool (under: Degreased, not carbonized).
- 5101.21.10.00 Wool for special uses (under: Unimproved wool; other wool, not finer than 46s) (cy kg, kg): General Free; Special none; Column 2 Free, under bond.
- 5101.21.15.00 Unimproved wool; other wool, not finer than 40s (cy kg, kg): General Free; Special none; Column 2 59.5¢/clean kg.
- 5101.21.30.00 Other wool, finer than 40s but not finer than 44s (cy kg, kg): General Free; Special none; Column 2 70.6¢/clean kg.
- 5101.21.35.00 Other wool, finer than 44s (under: Other) (cy kg, kg): General Free; Special none; Column 2 81.6¢/clean kg.
- 5101.21.40 Other (under: Not processed in any manner beyond the degreased condition): General 20.6¢/clean kg; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 81.6¢/clean kg.
- 5101.21.40.30 Not finer than 58s (under: Other) (cy kg, kg).
- 5101.21.40.60 Finer than 58s (under: Other) (cy kg, kg).
- 5101.21.65.00 Unimproved wool; other wool, not finer than 46s. (kg): General Free; Special none; Column 2 81.6¢/kg + 20%.
- 5101.21.70.00 Other (under: Other) (kg): General 6.5¢/kg + 5.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
- 5101.29 Other (under: Degreased, not carbonized).
- 5101.29.10.00 Wool for special uses (under: Unimproved wool; other wool, not finer than 46s) (cy kg, kg): General Free; Special none; Column 2 Free, under bond.
- 5101.29.15.00 Unimproved wool; other wool, not finer than 40s (cy kg, kg): General Free; Special none; Column 2 59.6¢/clean kg.
- 5101.29.30.00 Other wool, finer than 40s but not finer than 44s (cy kg, kg): General Free; Special none; Column 2 70.6¢/clean kg.
- 5101.29.35.00 Other wool, finer than 44s (under: Other) (cy kg, kg): General Free; Special none; Column 2 81.6¢/clean kg.
- 5101.29.40 Other (under: Not processed in any manner beyond the degreased condition): General 20.6¢/clean kg; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/clean kg.
- 5101.29.40.30 Not finer than 58s (under: Other) (cy kg, kg).
- 5101.29.40.60 Finer than 58s (under: Other) (cy kg, kg).
- 5101.29.65.00 Unimproved wool; other wool, not finer than 46s (kg): General Free; Special none; Column 2 81.6¢/kg + 20%.
- 5101.29.70.00 Other (under: Other) (kg): General 6.5¢/kg + 5.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
- 5101.30 Carbonized (under: Wool, not carded or combed).
- 5101.30.10.00 Unimproved wool; other wool, not finer than 40s (kg): General Free; Special none; Column 2 75.1¢/kg.
- 5101.30.15.00 Other wool, finer than 40s but not finer than 44s (kg): General Free; Special none; Column 2 86.1¢/kg.
- 5101.30.30.00 Other wool, finer than 44s but not finer than 46s (kg): General Free; Special none; Column 2 97¢/kg.
- 5101.30.40.00 Other (under: Not processed in any manner beyond the carbonized condition) (kg): General 24.4¢/kg; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 97¢/kg.
- 5101.30.65.00 Unimproved wool; other wool, not finer than 46s (kg): General Free; Special none; Column 2 81.6¢/kg + 20%.
- 5101.30.70.00 Other (under: Other) (kg): General 6.5¢/kg + 5.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.