HTS Heading 5203
Cotton, carded or combed
All 4 HTS codes under heading 5203 (cotton, carded or combed), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%, some per unit.
Every line of heading 5203
- 5203.00 Cotton, carded or combed.
- 5203.00.05.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 5%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 5%.
- 5203.00.10.00 Described in additional U.S. note 10 to this chapter and entered pursuant to its provisions (kg): General 5%; Special Free (A+,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
- 5203.00.30.00 Other (under: Fibers of cotton processed but not spun) (kg): General 31.4¢/kg; Special Free (A+,AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.9¢/kg.
- 5203.00.50.00 Other (under: Cotton, carded or combed) (kg): General 4.3%; Special Free (A+,AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.