HTS Heading 5209

Woven fabrics of cotton, containing 85 percent or more by weight of cotton, weighing more than 200 g/m²

All 61 HTS codes under heading 5209 (woven fabrics of cotton), with their duty rates from the 2026 HTS Revision 23. General duty 3% to 8.4%.

Every line of heading 5209

  • 5209 Woven fabrics of cotton, containing 85 percent or more by weight of cotton, weighing more than 200 g/m².
  • 5209.11.00 Plain weave (under: Unbleached): General 6.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 14.9%.
  • 5209.11.00.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5209.11.00.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5209.11.00.35 Other (313) (under: Not napped) (m², kg).
  • 5209.11.00.50 Napped (313) (under: Sheeting) (m², kg).
  • 5209.11.00.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5209.12.00 3-thread or 4-thread twill, including cross twill: General 6.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 14.9%.
  • 5209.12.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.12.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.19.00 Other fabrics (under: Unbleached): General 6.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 14.9%.
  • 5209.19.00.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5209.19.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5209.19.00.60 Duck, except plain weave (219) (m², kg).
  • 5209.19.00.90 Other (220) (under: Other fabrics) (m², kg).
  • 5209.21.00 Plain weave (under: Bleached): General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.9%.
  • 5209.21.00.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5209.21.00.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5209.21.00.35 Other (313) (under: Not napped) (m², kg).
  • 5209.21.00.50 Napped (313) (under: Sheeting) (m², kg).
  • 5209.21.00.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5209.22.00 3-thread or 4-thread twill, including cross twill: General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.9%.
  • 5209.22.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.22.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.29.00 Other fabrics (under: Bleached): General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.9%.
  • 5209.29.00.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5209.29.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5209.29.00.60 Duck, except plain weave (219) (m², kg).
  • 5209.29.00.90 Other (220) (under: Other fabrics) (m², kg).
  • 5209.31 Plain weave (under: Dyed).
  • 5209.31.30.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.31.60 Other (under: Plain weave): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.31.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
  • 5209.31.60.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5209.31.60.35 Other (313) (under: Not napped) (m², kg).
  • 5209.31.60.50 Napped (313) (under: Sheeting) (m², kg).
  • 5209.31.60.90 Plain weave duck (219) (under: Other) (m², kg).
  • 5209.32.00 3-thread or 4-thread twill, including cross twill: General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.32.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.32.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.39.00 Other fabrics (under: Dyed): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.39.00.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5209.39.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5209.39.00.60 Duck, except plain weave (219) (m², kg).
  • 5209.39.00.80 Of a width exceeding 127 cm (220) (m², kg).
  • 5209.39.00.90 Other (220) (under: Other) (m², kg).
  • 5209.41 Plain weave (under: Of yarns of different colors).
  • 5209.41.30.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.41.60 Other (under: Plain weave): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.41.60.20 Not napped (218) (under: Other) (m², kg).
  • 5209.41.60.40 Napped (218) (under: Other) (m², kg).
  • 5209.42.00 Denim (under: Of yarns of different colors): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.42.00.20 Weighing not more than 360 g/m² (225) (m², kg).
  • 5209.42.00.40 Weighing more than 360 g/m²(225) (m², kg).
  • 5209.42.00.60 Weighing not more than 360 g/m² (218) (m², kg).
  • 5209.42.00.80 Weighing more than 360 g/m² (218) (m², kg).
  • 5209.43.00 Other fabrics of 3-thread or 4-thread twill, including cross twill: General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.43.00.30 Not napped (218) (under: Other fabrics of 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.43.00.50 Napped (218) (under: Other fabrics of 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.49.00 Other fabrics (under: Of yarns of different colors): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.49.00.20 Of a width exceeding 127 cm (220) (m², kg).
  • 5209.49.00.40 Other (220) (under: Jacquard woven) (m², kg).
  • 5209.49.00.90 Other (218) (under: Other fabrics) (m², kg).
  • 5209.51 Plain weave (under: Printed).
  • 5209.51.30.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.51.60 Other (under: Plain weave): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.51.60.15 Discharge printed (314) (under: Poplin or broadcloth) (m², kg).
  • 5209.51.60.25 Other (314) (under: Poplin or broadcloth) (m², kg).
  • 5209.51.60.32 Discharge printed (313) (under: Not napped) (m², kg).
  • 5209.51.60.35 Other (313) (under: Not napped) (m², kg).
  • 5209.51.60.50 Napped (313) (under: Sheeting) (m², kg).
  • 5209.51.60.90 Plain weave duck (219) (under: Other) (m², kg).
  • 5209.52.00 3-thread or 4-thread twill, including cross twill: General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.52.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.52.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5209.59.00 Other fabrics (under: Printed): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9%.
  • 5209.59.00.15 Discharge printed (326) (under: Sateens) (m², kg).
  • 5209.59.00.25 Other (326) (under: Sateens) (m², kg).
  • 5209.59.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5209.59.00.60 Duck, except plain weave (219) (m², kg).
  • 5209.59.00.90 Other (220) (under: Other fabrics) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.