HTS Heading 5210

Woven fabrics of cotton, containing less than 85 percent by weight of cotton, mixed mainly or solely with man-made fibers, weighing not more than 200 g/m²

All 85 HTS codes under heading 5210 (woven fabrics of cotton), with their duty rates from the 2026 HTS Revision 23. General duty 7.8% to 15.5%.

Every line of heading 5210

  • 5210 Woven fabrics of cotton, containing less than 85 percent by weight of cotton, mixed mainly or solely with man-made fibers, weighing not more than 200 g/m².
  • 5210.11 Plain weave (under: Unbleached).
  • 5210.11.40 Of number 42 or lower number (under: Plain weave): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21.9%.
  • 5210.11.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5210.11.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5210.11.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5210.11.60 Of numbers 43 to 68 (under: Plain weave): General 10.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26.7%.
  • 5210.11.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5210.11.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5210.11.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5210.11.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5210.11.80 Of number 69 or higher number: General 13.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
  • 5210.11.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5210.11.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5210.19 Other fabrics (under: Unbleached).
  • 5210.19.10.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 9.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 23.7%.
  • 5210.19.20 Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill: General 9.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 23.7%.
  • 5210.19.20.20 Sateens (326) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.19.20.90 Other (317) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.19.40 Of number 42 or lower number (under: Other): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 21.9%.
  • 5210.19.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5210.19.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5210.19.60 Of numbers 43 to 68 (under: Other): General 8.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 26.7%.
  • 5210.19.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5210.19.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5210.19.80 Of number 69 or higher number: General 10.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 37.5%.
  • 5210.19.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5210.19.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5210.21 Plain weave (under: Bleached).
  • 5210.21.40 Of number 42 or lower number (under: Plain weave): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.9%.
  • 5210.21.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5210.21.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5210.21.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5210.21.60 Of numbers 43 to 68 (under: Plain weave): General 11.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.21.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5210.21.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5210.21.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5210.21.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5210.21.80 Of number 69 or higher number: General 12.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40.5%.
  • 5210.21.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5210.21.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5210.29 Other fabrics (under: Bleached).
  • 5210.29.10.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26.7%.
  • 5210.29.20 Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill: General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26.7%.
  • 5210.29.20.20 Sateens (326) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.29.20.90 Other (317) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.29.40 Of number 42 or lower number (under: Other): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 24.9%.
  • 5210.29.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5210.29.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5210.29.60 Of numbers 43 to 68 (under: Other): General 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.29.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5210.29.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5210.29.80 Of number 69 or higher number: General 14.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 40.5%.
  • 5210.29.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5210.29.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5210.31 Plain weave (under: Dyed).
  • 5210.31.40 Of number 42 or lower number (under: Plain weave): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.9%.
  • 5210.31.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5210.31.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5210.31.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5210.31.60 Of numbers 43 to 68 (under: Plain weave): General 12.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.31.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5210.31.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5210.31.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5210.31.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5210.31.80 Of number 69 or higher number: General 15.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.31.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5210.31.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5210.32.00.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.39 Other fabrics (under: Dyed).
  • 5210.39.20 Satin weave or twill weave (under: Other fabrics): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.39.20.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5210.39.20.90 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5210.39.40 Of number 42 or lower number (under: Other): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.9%.
  • 5210.39.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5210.39.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5210.39.60 Of numbers 43 to 68 (under: Other): General 12.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.39.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5210.39.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5210.39.80 Of number 69 or higher number: General 12.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.39.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5210.39.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5210.41 Plain weave (under: Of yarns of different colors).
  • 5210.41.40.00 Of number 42 or lower number (218) (m², kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.9%.
  • 5210.41.60.00 Of numbers 43 to 68 (218) (under: Plain weave) (m², kg): General 12.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.41.80.00 Of number 69 or higher number (218) (m², kg): General 15.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.49 Other fabrics (under: Of yarns of different colors).
  • 5210.49.10.00 3-thread or 4-thread twill, including cross twill (218) (m², kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.49.20.00 Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill (218) (m², kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.49.40 Of number 42 or lower number (under: Other): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.9%.
  • 5210.49.40.10 Oxford cloth (218) (under: Of number 42 or lower number) (m², kg).
  • 5210.49.40.20 Jacquard woven (220) (under: Of number 42 or lower number) (m², kg).
  • 5210.49.40.90 Other (218) (under: Of number 42 or lower number) (m², kg).
  • 5210.49.60 Of numbers 43 to 68 (under: Other): General 10.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.49.60.10 Oxford cloth (218) (under: Of numbers 43 to 68) (m², kg).
  • 5210.49.60.20 Jacquard woven (220) (under: Of numbers 43 to 68) (m², kg).
  • 5210.49.60.90 Other (218) (under: Of numbers 43 to 68) (m², kg).
  • 5210.49.80 Of number 69 or higher number: General 15.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.49.80.20 Jacquard woven (220) (under: Of number 69 or higher number) (m², kg).
  • 5210.49.80.90 Other (218) (under: Of number 69 or higher number) (m², kg).
  • 5210.51 Plain weave (under: Printed).
  • 5210.51.40 Of number 42 or lower number (under: Plain weave): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.9%.
  • 5210.51.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5210.51.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5210.51.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5210.51.60 Of numbers 43 to 68 (under: Plain weave): General 12.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.51.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5210.51.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5210.51.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5210.51.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5210.51.80 Of number 69 or higher number: General 15.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.51.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5210.51.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5210.59 Other fabrics (under: Printed).
  • 5210.59.10.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.59.20 Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill: General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.7%.
  • 5210.59.20.20 Sateens (326) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.59.20.90 Other (317) (under: Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill) (m², kg).
  • 5210.59.40 Of number 42 or lower number (under: Other): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P,PA, PE,S,SG); Column 2 27.9%.
  • 5210.59.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5210.59.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5210.59.60 Of numbers 43 to 68 (under: Other): General 10.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 32.7%.
  • 5210.59.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5210.59.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5210.59.80 Of number 69 or higher number: General 7.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 43.5%.
  • 5210.59.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5210.59.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.