HTS Heading 5211

Woven fabrics of cotton, containing less than 85 percent by weight of cotton, mixed mainly or solely with man-made fibers, weighing more than 200 g/m²

All 54 HTS codes under heading 5211 (woven fabrics of cotton), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.4%.

Every line of heading 5211

  • 5211 Woven fabrics of cotton, containing less than 85 percent by weight of cotton, mixed mainly or solely with man-made fibers, weighing more than 200 g/m².
  • 5211.11.00 Plain weave (under: Unbleached): General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19.9%.
  • 5211.11.00.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5211.11.00.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5211.11.00.35 Other (313) (under: Not napped) (m², kg).
  • 5211.11.00.50 Napped (313) (under: Sheeting) (m², kg).
  • 5211.11.00.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5211.12.00 3-thread or 4-thread twill, including cross twill: General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19.9%.
  • 5211.12.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.12.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.19.00 Other fabrics (under: Unbleached): General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19.9%.
  • 5211.19.00.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5211.19.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5211.19.00.60 Duck, except plain weave (219) (m², kg).
  • 5211.19.00.90 Other (220) (under: Other fabrics) (m², kg).
  • 5211.20 Bleached (under: Woven fabrics of cotton, containing less than 85 percent by weight of cotton, mixed mainly or solely with man-made fibers, weighing more than 200 g/m²).
  • 5211.20.21 Plain weave (under: Bleached): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5211.20.21.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5211.20.21.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5211.20.21.35 Other (313) (under: Not napped) (m², kg).
  • 5211.20.21.50 Napped (313) (under: Sheeting) (m², kg).
  • 5211.20.21.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5211.20.22 3-thread or 4-thread twill, including cross twill: General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5211.20.22.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.20.22.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.20.29 Other fabrics (under: Bleached): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5211.20.29.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5211.20.29.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5211.20.29.60 Duck, except plain weave (219) (m², kg).
  • 5211.20.29.90 Other (220) (under: Other fabrics) (m², kg).
  • 5211.31.00 Plain weave (under: Dyed): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.31.00.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5211.31.00.25 Osnaburg (313) (under: Not napped) (m², kg).
  • 5211.31.00.35 Other (313) (under: Not napped) (m², kg).
  • 5211.31.00.50 Napped (313) (under: Sheeting) (m², kg).
  • 5211.31.00.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5211.32.00 3-thread or 4-thread twill, including cross twill: General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.32.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.32.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.39.00 Other fabrics (under: Dyed): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.39.00.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5211.39.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5211.39.00.60 Duck, except plain weave (219) (m², kg).
  • 5211.39.00.90 Other (220) (under: Other fabrics) (m², kg).
  • 5211.41.00 Plain weave (under: Of yarns of different colors): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.41.00.20 Not napped (218) (under: Plain weave) (m², kg).
  • 5211.41.00.40 Napped (218) (under: Plain weave) (m², kg).
  • 5211.42.00 Denim (under: Of yarns of different colors): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.42.00.20 Weighing not more than 360 g/m² (225) (m², kg).
  • 5211.42.00.40 Weighing more than 360 g/m² (225) (m², kg).
  • 5211.42.00.60 Weighing not more than 360 g/m² (218) (m², kg).
  • 5211.42.00.80 Weighing more than 360 g/m² (218) (m², kg).
  • 5211.43.00 Other fabrics of 3-thread or 4-thread twill, including cross twill: General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.43.00.30 Not napped (218) (under: Other fabrics of 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.43.00.50 Napped (218) (under: Other fabrics of 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.49.00 Other fabrics (under: Of yarns of different colors): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.49.00.20 Jacquard woven (220) (under: Other fabrics) (m², kg).
  • 5211.49.00.90 Other (218) (under: Other fabrics) (m², kg).
  • 5211.51.00 Plain weave (under: Printed): General Free; Special none; Column 2 25.9%.
  • 5211.51.00.20 Poplin or broadcloth (314) (under: Plain weave) (m², kg).
  • 5211.51.00.30 Not napped (313) (under: Sheeting) (m², kg).
  • 5211.51.00.50 Napped (313) (under: Sheeting) (m², kg).
  • 5211.51.00.90 Plain weave duck (219) (under: Plain weave) (m², kg).
  • 5211.52.00 3-thread or 4-thread twill, including cross twill: General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.52.00.20 Not napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.52.00.40 Napped (317) (under: 3-thread or 4-thread twill, including cross twill) (m², kg).
  • 5211.59.00 Other fabrics (under: Printed): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25.9%.
  • 5211.59.00.15 Discharge printed (326) (under: Sateens) (m², kg).
  • 5211.59.00.25 Other (326) (under: Sateens) (m², kg).
  • 5211.59.00.40 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5211.59.00.60 Duck, except plain weave (219) (m², kg).
  • 5211.59.00.90 Other (220) (under: Other fabrics) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.