HTS Heading 5402

Synthetic filament yarn (other than sewing thread), not put up for retail sale, including synthetic monofilament of less than 67 decitex

All 54 HTS codes under heading 5402 (synthetic filament yarn), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.8%.

Every line of heading 5402

  • 5402 Synthetic filament yarn (other than sewing thread), not put up for retail sale, including synthetic monofilament of less than 67 decitex.
  • 5402.11 Of aramids (under: High tenacity yarn of nylon or other polyamides, whether or not textured).
  • 5402.11.30 Single yarn (under: Of aramids): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 5402.11.30.10 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.11.30.30 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.11.30.50 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.11.30.70 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.11.60.00 Multiple (folded) or cabled (606) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.19 Other (under: High tenacity yarn of nylon or other polyamides, whether or not textured).
  • 5402.19.30 Single yarn (under: Other): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.19.30.10 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.19.30.30 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.19.30.50 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.19.30.70 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.19.60.00 Multiple (folded) or cabled (606) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.20 High tenacity yarn of polyesters, whether or not textured.
  • 5402.20.30 Single yarn (under: High tenacity yarn of polyesters, whether or not textured): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.20.30.10 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.20.30.30 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.20.30.50 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.20.30.70 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.20.60.00 Multiple (folded) or cabled (606) (kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 5402.31 Of nylon or other polyamides, measuring per single yarn not more than 500 decitex.
  • 5402.31.30.00 Single yarn (600) (under: Of nylon or other polyamides, measuring per single yarn not more than 500 decitex) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.31.60.00 Multiple (folded) or cabled yarn (600) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.32 Of nylon or other polyamides, measuring per single yarn more than 500 decitex.
  • 5402.32.30.00 Single yarn (600) (under: Of nylon or other polyamides, measuring per single yarn more than 500 decitex) (kg): General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.32.60.00 Multiple (folded) or cabled yarn (600) (kg): General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 5402.33 Of polyesters (under: Textured yarn).
  • 5402.33.30.00 Single yarn (600) (under: Of polyesters) (kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.33.60.00 Multiple (folded) or cabled yarn (600) (kg): General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 5402.34 Of polypropylene (under: Textured yarn).
  • 5402.34.30.00 Single yarn (600) (under: Of polypropylene) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.34.60.00 Multiple (folded) or cabled yarn (600) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.39 Other (under: Textured yarn).
  • 5402.39.31 Single yarn (under: Other): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.39.31.10 Of polyethylene (600) (under: Single yarn) (kg).
  • 5402.39.31.90 Other (600) (under: Single yarn) (kg).
  • 5402.39.61 Multiple (folded) or cabled yarn: General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.39.61.10 Of polyethylene (600) (under: Multiple (folded) or cabled yarn) (kg).
  • 5402.39.61.90 Other (600) (under: Multiple (folded) or cabled yarn) (kg).
  • 5402.44.00 Elastomeric (under: Other yarn, single, untwisted or with a twist not exceeding 50 turns/m): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.44.00.05 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.44.00.40 Other (under: Elastomeric) (kg).
  • 5402.45 Other, of nylon or other polyamides.
  • 5402.45.10.00 Colored multifilament, untwisted or with a twist of less than 5 turns per meter, measuring not less than 22 decitex per filament, certified by the importer to be used in the manufacture of wigs for dolls (kg): General Free; Special none; Column 2 50%.
  • 5402.45.90 Other (under: Other, of nylon or other polyamides): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.45.90.10 Multifilament, partially oriented (kg).
  • 5402.45.90.30 Other (under: Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter) (kg).
  • 5402.45.90.40 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.46.00.00 Other, of polyesters, partially oriented (kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.47 Other, of polyesters (under: Other yarn, single, untwisted or with a twist not exceeding 50 turns/m).
  • 5402.47.10 Wholly of polyester, measuring not less than 75 decitex but not more than 80 decitex, and having 24 filaments per yarn: General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.47.10.20 Untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.47.10.40 With twist of 5 turns or more per meter (606) (kg).
  • 5402.47.90 Other (under: Other, of polyesters): General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.47.90.20 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.47.90.40 Multifilament, with twist of 5 turns or more per meter (606) (kg).
  • 5402.48.00 Other, of polypropylene (under: Other yarn, single, untwisted or with a twist not exceeding 50 turns/m): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.48.00.10 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
  • 5402.48.00.70 Other (under: Other, of polypropylene) (kg).
  • 5402.49 Other (under: Other yarn, single, untwisted or with a twist not exceeding 50 turns/m).
  • 5402.49.11.00 Colored multifilament, of modacrylic, untwisted or with a twist of less than 5 turns per meter, measuring not less than 22 decitex per filament, certified by the importer to be used in the manufacture of wigs for dolls (kg): General Free; Special none; Column 2 50%.
  • 5402.49.91 Other (under: Other): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.49.91.15 Of polyethylene (under: Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter) (kg).
  • 5402.49.91.40 Other (under: Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter) (kg).
  • 5402.49.91.75 Of polyethylene (606) (under: Multifilament, with twist of 5 turns or more per meter) (kg).
  • 5402.49.91.80 Other (606) (under: Multifilament, with twist of 5 turns or more per meter) (kg).
  • 5402.51.00.00 Of nylon or other polyamides (606) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.52 Of polyesters (under: Other yarn, single, with a twist exceeding 50 turns/m).
  • 5402.52.10.00 Wholly of polyester, measuring not less than 75 decitex but not more than 80 decitex, and having 24 filaments per yarn (606) (kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.52.90.00 Other (606) (under: Of polyesters) (kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 5402.53.00.00 Of polypropylene (606) (under: Other yarn, single, with a twist exceeding 50 turns/m) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.59.01.00 Other (606) (under: Other yarn, single, with a twist exceeding 50 turns/m) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5402.61.00.00 Of nylon or other polyamides (606) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.62.00.00 Of polyesters (606) (under: Other yarn, multiple (folded) or cabled) (kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 5402.63.00.00 Of polypropylene (606) (under: Other yarn, multiple (folded) or cabled) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
  • 5402.69.01.00 Other (606) (under: Other yarn, multiple (folded) or cabled) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.