HTS Heading 5403
Artificial filament yarn (other than sewing thread), not put up for retail sale, including artificial monofilament of less than 67 decitex
All 15 HTS codes under heading 5403 (artificial filament yarn), with their duty rates from the 2026 HTS Revision 23. General duty 7.5% to 10%.
Every line of heading 5403
- 5403 Artificial filament yarn (other than sewing thread), not put up for retail sale, including artificial monofilament of less than 67 decitex.
- 5403.10 High tenacity yarn of viscose rayon.
- 5403.10.30 Single yarn (under: High tenacity yarn of viscose rayon): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.10.30.20 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
- 5403.10.30.40 Multifilament, with twist of 5 turns or more per meter (606) (kg).
- 5403.10.60.00 Multiple (folded) or cabled (606) (kg): General 9.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
- 5403.31.00 Of viscose rayon, untwisted or with a twist not ex- ceeding 120 turns/m: General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.31.00.20 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
- 5403.31.00.40 Multifilament, with twist of 5 turns or more per meter (606) (kg).
- 5403.32.00.00 Of viscose rayon, with a twist exceeding 120 turns/m (606) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.33.00 Of cellulose acetate (under: Other yarn, single): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.33.00.20 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
- 5403.33.00.40 Multifilament, with twist of 5 turns or more per ` meter (606) (kg).
- 5403.39 Other (under: Other yarn, single).
- 5403.39.10.00 Textured yarn (600) (under: Other) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.39.90 Other (under: Other): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
- 5403.39.90.20 Monofilament; multifilament, untwisted or with twist of less than 5 turns per meter (kg).
- 5403.39.90.40 Multifilament, with twist of 5 turns or more per meter (606) (kg).
- 5403.41.00.00 Of viscose rayon (606) (under: Other yarn, multiple (folded) or cabled) (kg): General 9.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
- 5403.42.00.00 Of cellulose acetate (606) (under: Other yarn, multiple (folded) or cabled) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
- 5403.49 Other (under: Other yarn, multiple (folded) or cabled).
- 5403.49.10.00 Textured yarn (600) (under: Other) (kg): General 9.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
- 5403.49.90.00 Other (606) (under: Other) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.