HTS Heading 5601

Wadding of textile materials and articles thereof; textile fibers, not exceeding 5 mm in length (flock), textile dust and mill neps

All 9 HTS codes under heading 5601 (wadding of textile materials), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.3%.

Every line of heading 5601

  • 5601 Wadding of textile materials and articles thereof; textile fibers, not exceeding 5 mm in length (flock), textile dust and mill neps.
  • 5601.21.00 Of cotton (under: Wadding of textile materials and articles thereof): General 3.6%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 5601.21.00.10 Wadding, in the piece (223) (under: Of cotton) (kg).
  • 5601.21.00.90 Other (369) (under: Of cotton) (kg).
  • 5601.22.00 Of man-made fibers (under: Wadding of textile materials and articles thereof): General 6.3%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 74%.
  • 5601.22.00.10 Wadding, in the piece (223) (under: Of man-made fibers) (kg).
  • 5601.22.00.50 Flocked swabs, other than articles of heading 3926 (669) (kg).
  • 5601.22.00.91 Other (669) (under: Of man-made fibers) (kg).
  • 5601.29.00 Other (under: Wadding of textile materials and articles thereof): General 4%; Special Free (AU,B,BH, CL,CO,E*,IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 40%.
  • 5601.29.00.10 Containing 85 percent or more by weight of silk or silk waste (kg).
  • 5601.29.00.20 Of wool or fine animal hair (469) (kg).
  • 5601.29.00.90 Other (899) (under: Other) (kg).
  • 5601.30.00.00 Textile flock and dust and mill neps (kg): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.