HTS Chapter 56

Wadding, felt and nonwovens; special yarns; twine, cordage, ropes and cables

The 9 headings and 81 HTS codes of chapter 56 (wadding, felt and nonwovens), with their duty rates from the 2026 HTS Revision 23.

The 9 headings of chapter 56

Where it sits in the schedule

Chapter 56 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.