HTS Heading 5602

Felt, whether or not impregnated, coated, covered or laminated

All 8 HTS codes under heading 5602 (felt), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12%, some per unit.

Every line of heading 5602

  • 5602 Felt, whether or not impregnated, coated, covered or laminated.
  • 5602.10 Needleloom felt and stitchbonded fiber fabrics.
  • 5602.10.10.00 Laminated fabrics (223) (under: Needleloom felt and stitchbonded fiber fabrics) (kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 83.5%.
  • 5602.10.90 Other (under: Needleloom felt and stitchbonded fiber fabrics): General 10.6%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 74%.
  • 5602.10.90.10 Of wool or fine animal hair (414) (kg).
  • 5602.10.90.90 Other (223) (under: Other) (kg).
  • 5602.21.00.00 Of wool or fine animal hair (414) (kg): General 49.5¢/kg + 7.5%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 88¢/kg + 40%.
  • 5602.29.00.00 Of other textile materials (223) (kg): General 6.3%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 74%.
  • 5602.90 Other (under: Felt, whether or not impregnated, coated, covered or laminated).
  • 5602.90.30.00 Laminated fabrics (223) (under: Other) (kg): General Free; Special none; Column 2 83.5%.
  • 5602.90.60.00 Of man-made fibers (223) (under: Other) (kg): General 6.3%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 74%.
  • 5602.90.90.00 Other (414) (under: Other) (kg): General 52.9¢/kg + 8%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 88¢/kg + 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.