HTS Heading 5907

Textile fabrics otherwise impregnated, coated or covered; painted canvas being theatrical scenery, studio back-cloths or the like

All 7 HTS codes under heading 5907 (textile fabrics otherwise impregnated), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.

Every line of heading 5907

  • 5907.00 Textile fabrics otherwise impregnated, coated or covered; painted canvas being theatrical scenery, studio back-cloths or the like.
  • 5907.00.05.00 Theatrical, ballet, and operatic scenery and properties, including sets (229) (m2, kg): General Free; Special none; Column 2 83.5%.
  • 5907.00.15.00 Other (229) (under: Of man-made fibers) (m2, kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 83.5%.
  • 5907.00.25.00 Theatrical, ballet, and operatic scenery and properties, including sets (229) (m2, kg): General Free; Special none; Column 2 83.5%.
  • 5907.00.35.00 Other (229) (under: Other) (m2, kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 83.5%.
  • 5907.00.60.00 Of man-made fibers (229) (under: Other) (m2, kg): General Free; Special none; Column 2 50%.
  • 5907.00.80 Other (under: Other): General Free; Special none; Column 2 50%.
  • 5907.00.80.10 Of vegetable fibers, except cotton (810) (m2, kg).
  • 5907.00.80.90 Other (229) (under: Other) (m2, kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.