HTS Chapter 59
Impregnated, coated, covered or laminated textile fabrics; textile articles for industrial use
The 11 headings and 75 HTS codes of chapter 59 (impregnated, coated, covered or laminated textile fabrics), with their duty rates from the 2026 HTS Revision 23.
The 11 headings of chapter 59
- 5901: Textile fabrics coated with gum or amylaceous substances, of a kind used for the outer covers of books or the like; tracing cloth; prepared painting canvas; buckram and similar stiffened textile fabrics of a kind used for hat foundations (4 codes, General duty 4.1% to 7%)
- 5902: Tire cord fabric of high tenacity yarn of nylon or other poly- amides, polyesters or viscose rayon (3 codes, General duty Free to 5.8%)
- 5903: Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902 (21 codes, General duty Free to 14.1%)
- 5904: Linoleum, whether or not cut to shape; floor coverings con- sisting of a coating or covering applied on a textile backing, whether or not cut to shape (3 codes, General duty Free)
- 5905: Textile wall coverings (2 codes, General duty Free)
- 5906: Rubberized textile fabrics, other than those of heading 5902 (9 codes, General duty Free to 7.5%)
- 5907: Textile fabrics otherwise impregnated, coated or covered; painted canvas being theatrical scenery, studio back-cloths or the like (7 codes, General duty Free to 8%)
- 5908: Textile wicks, woven, plaited or knitted, for lamps, stoves, lighters, candles or the like; incandescent gas mantles and tubular knitted gas mantle fabric therefor, whether or not impregnated (1 code, General duty 3.4%)
- 5909: Textile hosepiping and similar textile tubing, with or without lining, armor or accessories of other materials (2 codes, General duty Free to 3.3%)
- 5910: Transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material (7 codes, General duty 2.6% to 4%)
- 5911: Textile products and articles, for technical uses, specified in note 8 to this chapter (16 codes, General duty Free to 8%)
Where it sits in the schedule
Chapter 59 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.