HTS Heading 5906

Rubberized textile fabrics, other than those of heading 5902

All 9 HTS codes under heading 5906 (rubberized textile fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.5%.

Every line of heading 5906

  • 5906 Rubberized textile fabrics, other than those of heading 5902.
  • 5906.10.00.00 Adhesive tape of a width not exceeding 20 cm (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 5906.91 Knitted or crocheted (under: Other).
  • 5906.91.10.00 Of cotton (under: Knitted or crocheted) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,IL,JO, KR, MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5906.91.20.00 Over 70 percent by weight of rubber or plastics (m2, kg): General Free; Special none; Column 2 25%.
  • 5906.91.25.00 Other (229) (under: Of man-made fibers) (m2, kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 84.5%.
  • 5906.91.30.00 Other (under: Knitted or crocheted) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 40%.
  • 5906.99 Other (under: Other).
  • 5906.99.10.00 Of cotton (under: Other) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5906.99.20.00 Over 70 percent by weight of rubber or plastics (m2, kg): General Free; Special none; Column 2 25%.
  • 5906.99.25.00 Other (229) (under: Of man-made fibers) (m2, kg): General Free; Special none; Column 2 84.5%.
  • 5906.99.30.00 Other (under: Other) (m2, kg): General 3.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.