HTS Heading 5909
Textile hosepiping and similar textile tubing, with or without lining, armor or accessories of other materials
All 2 HTS codes under heading 5909 (textile hosepiping), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.3%.
Every line of heading 5909
- 5909.00 Textile hosepiping and similar textile tubing, with or without lining, armor or accessories of other materials.
- 5909.00.10.00 Of vegetable fibers (under: Textile hosepiping and similar textile tubing, with or without lining, armor or accessories of other materials) (kg): General Free; Special none; Column 2 21.5%.
- 5909.00.20.00 Other (under: Textile hosepiping and similar textile tubing, with or without lining, armor or accessories of other materials) (kg): General 3.3%; Special Free (AU,B,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 88.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.