HTS Heading 5910
Transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material
All 7 HTS codes under heading 5910 (transmission or conveyor belts), with their duty rates from the 2026 HTS Revision 23. General duty 2.6% to 4%.
Every line of heading 5910
- 5910.00 Transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material.
- 5910.00.10 Of man-made fibers (under: Transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
- 5910.00.10.10 V-belts (under: Belts) (No., kg).
- 5910.00.10.20 Synchronous belts (under: Belts) (No., kg).
- 5910.00.10.30 Other (under: Belts) (No., kg).
- 5910.00.10.60 Link (under: Belting) (m, kg).
- 5910.00.10.70 Other (under: Belting) (m, kg).
- 5910.00.10.90 Other (under: Of man-made fibers) (kg).
- 5910.00.90.00 Other (under: Transmission or conveyor belts or belting, of textile material, whether or not impregnated, coated, covered or laminated with plastics, or reinforced with metal or other material) (kg): General 2.6%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.