HTS Heading 6004
Knitted or crocheted fabrics of a width exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001
All 7 HTS codes under heading 6004 (knitted or crocheted fabrics), with their duty rates from the 2026 HTS Revision 23. General duty 7% to 12.3%.
Every line of heading 6004
- 6004 Knitted or crocheted fabrics of a width exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001.
- 6004.10.00 Containing by weight 5 percent or more of elastomeric yarn but not containing rubber thread: General 12.3%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
- 6004.10.00.10 Open-work figured fabrics (222) (kg).
- 6004.10.00.25 Other (222) (under: Warp knit) (kg).
- 6004.10.00.85 Other (222) (under: Containing by weight 5 percent or more of elastomeric yarn but not containing rubber thread) (kg).
- 6004.90 Other (under: Knitted or crocheted fabrics of a width exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001).
- 6004.90.20 Containing elastomeric yarn and rubber thread: General 12.3%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
- 6004.90.20.10 Open-work figured fabrics (222) (kg).
- 6004.90.20.25 Other (222) (under: Warp knit) (kg).
- 6004.90.20.85 Other (222) (under: Containing elastomeric yarn and rubber thread) (kg).
- 6004.90.90.00 Other (222) (under: Other) (kg): General 7%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.