HTS Heading 6003

Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002

All 10 HTS codes under heading 6003 (knitted or crocheted fabrics), with their duty rates from the 2026 HTS Revision 23. General duty 6.6% to 14.1%.

Every line of heading 6003

  • 6003 Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002.
  • 6003.10 Of wool or fine animal hair (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002).
  • 6003.10.10.00 Open-work fabrics, warp knit (229) (kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.10.90.00 Other (899) (under: Of wool or fine animal hair) (kg): General 6.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 59%.
  • 6003.20 Of cotton (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002).
  • 6003.20.10.00 Open-work fabrics, warp knit (229) (kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.20.30.00 Other (222) (under: Of cotton) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 35%.
  • 6003.30 Of synthetic fibers (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002).
  • 6003.30.10.00 Open-work fabrics, warp knit (229) (kg): General 14.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6003.30.60.00 Other (222) (under: Of synthetic fibers) (kg): General 7.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.40 Of artificial fibers (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002).
  • 6003.40.10.00 Open-work fabrics, warp knit (229) (kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.40.60.00 Other (222) (under: Of artificial fibers) (kg): General 7.6%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.90 Other (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002).
  • 6003.90.10.00 Open-work fabrics, warp knit (229) (kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6003.90.90.00 Other (899) (under: Other) (kg): General 6.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 59%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.