HTS Chapter 60
Knitted or crocheted fabrics
The 6 headings and 106 HTS codes of chapter 60 (knitted or crocheted fabrics), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 60
- 6001: Pile fabrics, including "long pile" fabrics and terry fabrics, knitted or crocheted (13 codes, General duty 4% to 18.5%)
- 6002: Knitted or crocheted fabrics of a width not exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001 (6 codes, General duty 8% to 8.8%)
- 6003: Knitted or crocheted fabrics of a width not exceeding 30 cm, other than those of heading 6001 or 6002 (10 codes, General duty 6.6% to 14.1%)
- 6004: Knitted or crocheted fabrics of a width exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001 (7 codes, General duty 7% to 12.3%)
- 6005: Warp knit fabrics (including those made on galloon knitting machines), other than those of headings 6001 to 6004 (31 codes, General duty 10%)
- 6006: Other knitted or crocheted fabrics (39 codes, General duty Free to 10%)
Where it sits in the schedule
Chapter 60 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.