HTS Heading 6006

Other knitted or crocheted fabrics

All 39 HTS codes under heading 6006 (other knitted or crocheted fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10%.

Every line of heading 6006

  • 6006 Other knitted or crocheted fabrics.
  • 6006.10.00.00 Of wool or fine animal hair (414) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65.5%.
  • 6006.21 Unbleached or bleached (under: Of cotton).
  • 6006.21.10.00 Circular knit, wholly of cotton yarns exceeding 100 metric number per single yarn (222) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6006.21.90 Other (under: Unbleached or bleached): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6006.21.90.20 Of single knit construction (222) (kg).
  • 6006.21.90.80 Other (222) (under: Other) (kg).
  • 6006.22 Dyed (under: Of cotton).
  • 6006.22.10.00 Circular knit, wholly of cotton yarns exceeding 100 metric number per single yarn (222) (kg): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6006.22.90 Other (under: Dyed): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6006.22.90.20 Of single knit construction (222) (kg).
  • 6006.22.90.80 Other (222) (under: Other) (kg).
  • 6006.23 Of yarns of different colors (under: Of cotton).
  • 6006.23.10.00 Circular knit, wholly of cotton yarns exceeding 100 metric number per single yarn (222) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6006.23.90 Other (under: Of yarns of different colors): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6006.23.90.20 Of single knit construction (222) (kg).
  • 6006.23.90.80 Other (222) (under: Other) (kg).
  • 6006.24 Printed (under: Of cotton).
  • 6006.24.10.00 Circular knit, wholly of cotton yarns exceeding 100 metric number per single yarn (222) (kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6006.24.90 Other (under: Printed): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6006.24.90.20 Of single knit construction (222) (kg).
  • 6006.24.90.80 Other (222) (under: Other) (kg).
  • 6006.31.00 Unbleached or bleached (under: Of synthetic fibers): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.31.00.20 Of nylon (222) (under: Of double knit or interlock construction) (kg).
  • 6006.31.00.40 Of polyester (222) (under: Of double knit or interlock construction) (kg).
  • 6006.31.00.60 Other (222) (under: Of double knit or interlock construction) (kg).
  • 6006.31.00.80 Other (222) (under: Unbleached or bleached) (kg).
  • 6006.32.00 Dyed (under: Of synthetic fibers): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.32.00.20 Of nylon (222) (under: Of double knit or interlock construction) (kg).
  • 6006.32.00.40 Of polyester (222) (under: Of double knit or interlock construction) (kg).
  • 6006.32.00.60 Other (222) (under: Of double knit or interlock construction) (kg).
  • 6006.32.00.80 Other (222) (under: Dyed) (kg).
  • 6006.33.00 Of yarns of different colors (under: Of synthetic fibers): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.33.00.20 Of nylon (222) (under: Of double knit or interlock construction) (kg).
  • 6006.33.00.40 Of polyester (222) (under: Of double knit or interlock construction) (kg).
  • 6006.33.00.60 Other (222) (under: Of double knit or interlock construction) (kg).
  • 6006.33.00.80 Other (222) (under: Of yarns of different colors) (kg).
  • 6006.34.00 Printed (under: Of synthetic fibers): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.34.00.20 Of nylon (222) (under: Of double knit or interlock construction) (kg).
  • 6006.34.00.40 Of polyester (222) (under: Of double knit or interlock construction) (kg).
  • 6006.34.00.60 Other (222) (under: Of double knit or interlock construction) (kg).
  • 6006.34.00.80 Other (222) (under: Printed) (kg).
  • 6006.41.00 Unbleached or bleached (under: Of artificial fibers): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.41.00.25 Of double knit or interlock construction (222) (kg).
  • 6006.41.00.85 Other (222) (under: Unbleached or bleached) (kg).
  • 6006.42.00 Dyed (under: Of artificial fibers): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.42.00.25 Of double knit or interlock construction (222) (kg).
  • 6006.42.00.85 Other (222) (under: Dyed) (kg).
  • 6006.43.00 Of yarns of different colors (under: Of artificial fibers): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.43.00.25 Of double knit or interlock construction (222) (kg).
  • 6006.43.00.85 Other (222) (under: Of yarns of different colors) (kg).
  • 6006.44.00 Printed (under: Of artificial fibers): General 10%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 113.5%.
  • 6006.44.00.25 Of double knit or interlock construction (222) (kg).
  • 6006.44.00.85 Other (222) (under: Printed) (kg).
  • 6006.90 Other (under: Other knitted or crocheted fabrics).
  • 6006.90.10.00 Containing 85 percent or more by weight of silk or silk waste (kg): General 7%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6006.90.90.00 Other (899) (under: Other) (kg): General Free; Special none; Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.