HTS Heading 6101

Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103

All 12 HTS codes under heading 6101 (men's or boys' overcoats), with their duty rates from the 2026 HTS Revision 23. General duty 0.9% to 28.2%, some per unit.

Every line of heading 6101

  • 6101 Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103.
  • 6101.20.00 Of cotton (under: Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103): General 15.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 6101.20.00.10 Men's (334) (under: Of cotton) (doz., kg).
  • 6101.20.00.20 Boys' (334) (under: Of cotton) (doz., kg).
  • 6101.30 Of man-made fibers (under: Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103).
  • 6101.30.10.00 Containing 25 percent or more by weight of leather (634) (doz., kg): General 5.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6101.30.15.00 Containing 23 percent or more by weight of wool or fine animal hair (434) (doz., kg): General 38.6¢/kg + 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
  • 6101.30.20 Other (under: Other): General 28.2%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 72%.
  • 6101.30.20.10 Men's (634) (under: Other) (doz., kg).
  • 6101.30.20.20 Boys' (634) (under: Other) (doz., kg).
  • 6101.90 Of other textile materials (under: Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103).
  • 6101.90.05.00 Of wool or fine animal hair (434) (doz., kg): General 61.7¢/kg + 16%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
  • 6101.90.10.00 Containing 70 percent or more by weight of silk or silk waste (734) (doz., kg): General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6101.90.90 Other (under: Of other textile materials): General 5.7%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
  • 6101.90.90.10 Subject to cotton restraints (334) (doz., kg).
  • 6101.90.90.20 Subject to wool restraints (434) (doz., kg).
  • 6101.90.90.30 Subject to man-made fiber restraints (634) (doz., kg).
  • 6101.90.90.60 Other (834) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.