HTS Heading 6115

Panty hose, tights, stockings, socks and other hosiery, including graduated compression hosiery (for example, stockings for varicose veins) and footwear without applied soles, knitted or crocheted

All 32 HTS codes under heading 6115 (panty hose, tights, stockings), with their duty rates from the 2026 HTS Revision 23. General duty Free to 18.8%.

Every line of heading 6115

  • 6115 Panty hose, tights, stockings, socks and other hosiery, including graduated compression hosiery (for example, stockings for varicose veins) and footwear without applied soles, knitted or crocheted.
  • 6115.10 Graduated compression hosiery (for example, stockings for varicose veins).
  • 6115.10.05.00 Surgical panty hose and surgical stockings with graduated compression for orthopedic treatment (doz. prs., kg): General Free; Special none; Column 2 40%.
  • 6115.10.10.00 Of synthetic fibers (659) (under: Other graduated compression panty hose and tights) (doz. prs., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
  • 6115.10.15 Of other textile materials (under: Other graduated compression panty hose and tights): General 16%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6115.10.15.10 Of cotton (359) (under: Of other textile materials) (doz. prs., kg).
  • 6115.10.15.20 Of wool or fine animal hair (459) (doz. prs., kg).
  • 6115.10.15.40 Other (859) (under: Of other textile materials) (doz. prs., kg).
  • 6115.10.30.00 Of cotton (332) (under: Other graduated compression hosiery) (doz. prs., kg): General 13.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 51%.
  • 6115.10.40.00 Of synthetic fibers (632) (under: Other graduated compression hosiery) (doz. prs., kg): General 14.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 6115.10.55.00 Of artificial fibers (632) (under: Other graduated compression hosiery) (doz. prs., kg): General 14.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 6115.10.60.00 Of other textile materials (832) (doz. prs., kg): General 9.9%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.21.00 Of synthetic fibers, measuring per single yarn less than 67 decitex: General 16%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
  • 6115.21.00.10 Tights (659) (under: Of synthetic fibers, measuring per single yarn less than 67 decitex) (doz. prs., kg).
  • 6115.21.00.20 Other (632) (under: Of synthetic fibers, measuring per single yarn less than 67 decitex) (doz. prs., kg).
  • 6115.22.00.00 Of synthetic fibers, measuring per single yarn 67 decitex or more (659) (doz. prs., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
  • 6115.29 Of other textile materials (under: Other panty hose and tights).
  • 6115.29.40.00 Containing 70 percent or more by weight of silk or silk waste (doz. prs., kg): General 2.6%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6115.29.80 Other (under: Of other textile materials): General 16%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6115.29.80.10 Of cotton (359) (under: Other) (doz. prs., kg).
  • 6115.29.80.20 Of wool or fine animal hair (459) (doz. prs., kg).
  • 6115.29.80.40 Other (859) (under: Other) (doz. prs., kg).
  • 6115.30 Other women's full-length or knee-length hosiery, measuring per single yarn less than 67 decitex.
  • 6115.30.10.00 Containing 70 percent or more by weight of silk or silk waste (doz. prs., kg): General 2.7%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6115.30.90 Other (under: Other women's full-length or knee-length hosiery, measuring per single yarn less than 67 decitex): General 14.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6115.30.90.10 Of man-made fibers (632) (under: Other) (doz. prs., kg).
  • 6115.30.90.30 Other (832) (under: Other) (doz. prs., kg).
  • 6115.94.00.00 Of wool or fine animal hair (432) (doz. prs., kg): General 11.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.95 Of cotton (under: Other).
  • 6115.95.60.00 Containing lace or net (332) (under: Of cotton) (doz. prs., kg): General 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.95.90.00 Other (332) (under: Of cotton) (doz. prs., kg): General 13.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 51%.
  • 6115.96 Of synthetic fibers (under: Other).
  • 6115.96.60 Containing lace or net (under: Of synthetic fibers): General 18.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.96.60.10 Containing 23 percent or more by weight of wool or fine animal hair (432) (doz. prs., kg).
  • 6115.96.60.20 Other (632) (under: Containing lace or net) (doz. prs., kg).
  • 6115.96.90 Other (under: Of synthetic fibers): General 14.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 6115.96.90.10 Containing 23 percent or more by weight of wool or fine animal hair (432) (doz. prs., kg).
  • 6115.96.90.20 Other (632) (under: Other) (doz. prs., kg).
  • 6115.99 Of other textile materials (under: Other).
  • 6115.99.14 Containing lace or net (under: Of artificial fibers): General 18.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.99.14.10 Containing 23 percent or more by weight of wool or fine animal hair (432) (doz. prs., kg).
  • 6115.99.14.20 Other (632) (under: Containing lace or net) (doz. prs., kg).
  • 6115.99.19 Other (under: Of artificial fibers): General 14.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 6115.99.19.10 Containing 23 percent or more by weight of wool or fine animal hair (432) (doz. prs., kg).
  • 6115.99.19.20 Other (632) (under: Other) (doz. prs., kg).
  • 6115.99.40.00 Containing 70 percent or more by weight of silk or silk waste (doz. prs., kg): General 1.6%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6115.99.90.00 Other (832) (under: Of other textile materials) (doz. prs., kg): General 9.9%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.