HTS Heading 6116

Gloves, mittens and mitts, knitted or crocheted

All 45 HTS codes under heading 6116 (gloves, mittens and mitts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 23.5%, some per unit.

Every line of heading 6116

  • 6116 Gloves, mittens and mitts, knitted or crocheted.
  • 6116.10 Impregnated, coated, covered or laminated with plastics or rubber.
  • 6116.10.05.00 Ice hockey gloves and field hockey gloves (doz. prs., kg): General Free; Special none; Column 2 25%.
  • 6116.10.08.00 Other gloves, mittens and mitts, all the foregoing specially designed for use in sports, including ski and snowmobile gloves, mittens and mitts (doz. prs., kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 6116.10.13.00 Containing over 50 percent by weight of plastics or rubber (doz. prs., kg): General 12.5%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 61%.
  • 6116.10.17 Other (under: Of vegetable fibers): General 23.5%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 22.5% (E); Column 2 61%.
  • 6116.10.17.20 Subject to cotton restraints (331) (doz. prs., kg).
  • 6116.10.17.30 Subject to man-made fiber restraints (631) (doz. prs., kg).
  • 6116.10.17.40 Other (831) (under: Other) (doz. prs., kg).
  • 6116.10.44.00 Containing over 50 percent by weight of plastics or rubber (doz. prs., kg): General 9.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA, OM,P,PA,PE,S,SG) 8.9% (E); Column 2 90%.
  • 6116.10.48 Other (under: Other): General 18.6%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 16.3% (E); Column 2 90%.
  • 6116.10.48.10 Subject to cotton restraints (331) (doz. prs., kg).
  • 6116.10.48.20 Subject to man-made fiber re- straints (631) (doz. prs., kg).
  • 6116.10.48.30 Other (831) (under: Other) (doz. prs., kg).
  • 6116.10.55 Containing 50 percent or more by weight of cotton, man-made fibers or other textile fibers, or any combination thereof: General 13.2%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 10.7% (E); Column 2 75%.
  • 6116.10.55.10 Subject to cotton restraints (331) (doz. prs., kg).
  • 6116.10.55.20 Subject to man-made fiber restraints (631) (doz. prs., kg).
  • 6116.10.55.30 Other (831) (under: Containing 50 percent or more by weight of cotton, man-made fibers or other textile fibers, or any combination thereof) (doz. prs., kg).
  • 6116.10.65.00 Other (under: Other) (doz. prs., kg): General 7%; Special Free (AU,BH, CL,CO,IL, JO,KR,MA, OM,P,PA,PE,S,SG) 6% (E); Column 2 75%.
  • 6116.10.75 Containing 50 percent or more by weight of cotton, man-made fibers or other textile fibers, or any combination thereof: General 13.2%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 25%.
  • 6116.10.75.10 Subject to cotton restraints (331) (doz. prs., kg).
  • 6116.10.75.20 Subject to man-made fiber restraints (631) (doz. prs., kg).
  • 6116.10.75.30 Other (831) (under: Containing 50 percent or more by weight of cotton, man-made fibers or other textile fibers, or any combination thereof) (doz. prs., kg).
  • 6116.10.95.00 Other (under: With fourchettes) (doz. prs., kg): General 7%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 25%.
  • 6116.91.00.00 Of wool or fine animal hair (431) (doz. prs., kg): General 31.2¢/kg + 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.10/kg +50%.
  • 6116.92 Of cotton (under: Other).
  • 6116.92.05.00 Ice hockey gloves and field hockey gloves (doz. prs., kg): General Free; Special none; Column 2 45%.
  • 6116.92.08.00 Other gloves, mittens and mitts, all the fore going specially designed for use in sports, including ski and snowmobile gloves, mittens and mitts (doz. prs., kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6116.92.64 Without fourchettes (under: Made from a pre-existing machine knit fabric): General 23.5%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 22.5% (E); Column 2 90%.
  • 6116.92.64.10 Terry cloth type, looped pile fabric (331) (doz. prs., kg).
  • 6116.92.64.20 Jersey type, brushed or napped fabric (331) (doz. prs., kg).
  • 6116.92.64.30 Lisle type, no pile, not brushed or napped (331) (doz. prs., kg).
  • 6116.92.64.40 Other (331) (under: Without fourchettes) (doz. prs., kg).
  • 6116.92.74 With fourchettes (under: Made from a pre-existing machine knit fabric): General 23.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6116.92.74.50 Jersey type, brushed or napped fabric (331) (doz. prs., kg).
  • 6116.92.74.60 Lisle type, no pile, not brushed or napped (331) (doz. prs., kg).
  • 6116.92.74.70 Other (331) (under: With fourchettes) (doz. prs., kg).
  • 6116.92.88.00 Without fourchettes (331) (under: Other) (doz. prs., kg): General 9.4%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 7.4% (E); Column 2 90%.
  • 6116.92.94.00 With fourchettes (331) (under: Other) (doz. prs., kg): General 9.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6116.93 Of synthetic fibers (under: Other).
  • 6116.93.05.00 Ice hockey gloves and field hockey gloves (doz. prs., kg): General Free; Special none; Column 2 45%.
  • 6116.93.08.00 Other gloves, mittens and mitts, all the fore going specially designed for use in sports, including ski and snowmobile gloves, mittens and mitts (doz. prs., kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6116.93.64.00 Without fourchettes (431) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz. prs., kg): General 31¢/kg + 6.9%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 31¢/kg + 5.4% (E); Column 2 $1.10/kg + 50%.
  • 6116.93.74.00 With fourchettes (431) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz. prs., kg): General 31¢/kg + 6.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 $1.10/kg + 50%.
  • 6116.93.88.00 Without fourchettes (631) (under: Other) (doz. prs., kg): General 18.6%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 16.3% (E); Column 2 90%.
  • 6116.93.94.00 With fourchettes (631) (under: Other) (doz. prs., kg): General 18.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6116.99 Of other textile materials (under: Other).
  • 6116.99.20.00 Ice hockey gloves and field hockey gloves (doz. prs., kg): General Free; Special none; Column 2 45%.
  • 6116.99.35.00 Other gloves, mittens and mitts, all the fore going specially designed for use in sports, including ski and snowmobile gloves, mittens and mitts (doz. prs., kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6116.99.48.00 Without fourchettes (631) (under: Other) (doz. prs., kg): General 18.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG) 16.5% (E); Column 2 90%.
  • 6116.99.54.00 With fourchettes (631) (under: Other) (doz. prs., kg): General 18.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6116.99.75.00 Containing 70 percent or more by weight of silk or silk waste (doz. prs., kg): General Free; Special none; Column 2 40%.
  • 6116.99.95 Other (under: Of other textile materials): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 6116.99.95.10 Subject to cotton restraints (331) (doz. prs., kg).
  • 6116.99.95.20 Subject to wool restraints (431) (doz. prs., kg).
  • 6116.99.95.30 Subject to man-made fiber restraints (631) (doz. prs., kg).
  • 6116.99.95.60 Other (831) (under: Other) (doz. prs., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.