HTS Heading 6301
Blankets and traveling rugs
All 10 HTS codes under heading 6301 (blankets and traveling rugs), with their duty rates from the 2026 HTS Revision 23. General duty Free to 11.4%.
Every line of heading 6301
- 6301 Blankets and traveling rugs.
- 6301.10.00.00 Electric blankets (666) (under: Blankets and traveling rugs) (No., kg): General 11.4%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
- 6301.20.00 Blankets (other than electric blankets) and traveling rugs, of wool or fine animal hair: General Free; Special none; Column 2 $1.10/kg + 60%.
- 6301.20.00.10 Not over 3 meters in length (464) (No., kg).
- 6301.20.00.20 Over 3 meters in length (410) (m2, kg).
- 6301.30.00 Blankets (other than electric blankets) and traveling rugs, of cotton: General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 30%.
- 6301.30.00.10 Woven (369) (under: Blankets (other than electric blankets) and traveling rugs, of cotton) (No., kg).
- 6301.30.00.20 Other (369) (under: Blankets (other than electric blankets) and traveling rugs, of cotton) (No., kg).
- 6301.40.00 Blankets (other than electric blankets) and traveling rugs, of synthetic fibers: General 8.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
- 6301.40.00.10 Woven (666) (under: Blankets (other than electric blankets) and traveling rugs, of synthetic fibers) (No., kg).
- 6301.40.00.20 Other (666) (under: Blankets (other than electric blankets) and traveling rugs, of synthetic fibers) (No., kg).
- 6301.90.00 Other blankets and traveling rugs: General 7.2%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 90%.
- 6301.90.00.10 Of artificial fibers (666) (under: Other blankets and traveling rugs) (No., kg).
- 6301.90.00.20 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 6301.90.00.30 Other (899) (under: Other) (No., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.