HTS Chapter 63
Other made up textile articles; sets; worn clothing and worn textile articles; rags
The 10 headings and 229 HTS codes of chapter 63 (other made up textile articles), with their duty rates from the 2026 HTS Revision 23.
The 10 headings of chapter 63
- 6301: Blankets and traveling rugs (10 codes, General duty Free to 11.4%)
- 6302: Bed linen, table linen, toilet linen and kitchen linen (101 codes, General duty Free to 20.9%)
- 6303: Curtains (including drapes) and interior blinds; curtain or bed valances (14 codes, General duty 6.4% to 11.3%)
- 6304: Other furnishing articles, excluding those of heading 9404 (31 codes, General duty 3.2% to 14.9%)
- 6305: Sacks and bags, of a kind used for the packing of goods (10 codes, General duty Free to 8.4%)
- 6306: Tarpaulins, awnings and sunblinds; tents (including temporary canopies and similar articles); sails for boats, sailboards or landcraft; camping goods (15 codes, General duty Free to 8.8%)
- 6307: Other made up articles, including dress patterns (38 codes, General duty Free to 7.9%)
- 6308: Needlecraft sets consisting of woven fabric and yarn, whether or not with accessories, for making up into rugs, tapestries, embroidered tablecloths or napkins, or similar textile articles, put up in packings for retail sale (2 codes, General duty 11.4%)
- 6309: Worn clothing and other worn articles (2 codes, General duty Free)
- 6310: Used or new rags, scrap twine, cordage, rope and cables, and worn out articles of twine, cordage, rope or cables, of textile materials (6 codes, General duty Free, some per unit)
Where it sits in the schedule
Chapter 63 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.