HTS Heading 6302

Bed linen, table linen, toilet linen and kitchen linen

All 101 HTS codes under heading 6302 (bed linen, table linen), with their duty rates from the 2026 HTS Revision 23. General duty Free to 20.9%.

Every line of heading 6302

  • 6302 Bed linen, table linen, toilet linen and kitchen linen.
  • 6302.10.00 Bed linen, knitted or crocheted: General 6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6302.10.00.05 Pillowcases and bolster cases (362) (No., kg).
  • 6302.10.00.08 Sheets (362) (under: Of cotton) (No., kg).
  • 6302.10.00.15 Other (362) (under: Of cotton) (No., kg).
  • 6302.10.00.20 Other (666) (under: Bed linen, knitted or crocheted) (No., kg).
  • 6302.21 Of cotton (under: Other bed linen, printed).
  • 6302.21.30 Napped (under: Containing any embroidery, lace, braid, edging, trimming, piping or applique work): General 11.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.21.30.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.21.30.20 Sheets (361) (under: Napped) (No., kg).
  • 6302.21.30.30 Bolster cases (360) (under: Napped) (No., kg).
  • 6302.21.30.40 Pillowcovers (369) (under: Napped) (No., kg).
  • 6302.21.30.50 Other (362) (under: Napped) (No., kg).
  • 6302.21.50 Not napped (under: Containing any embroidery, lace, braid, edging, trimming, piping or applique work): General 20.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.21.50.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.21.50.20 Sheets (361) (under: Not napped) (No., kg).
  • 6302.21.50.30 Bolster cases (360) (under: Not napped) (No., kg).
  • 6302.21.50.40 Pillowcovers (369) (under: Not napped) (No., kg).
  • 6302.21.50.50 Other (362) (under: Not napped) (No., kg).
  • 6302.21.70 Napped (under: Other): General 2.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6302.21.70.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.21.70.20 Sheets (361) (under: Napped) (No., kg).
  • 6302.21.70.30 Bolster cases (360) (under: Napped) (No., kg).
  • 6302.21.70.40 Pillow covers (369) (under: Napped) (No., kg).
  • 6302.21.70.50 Other (362) (under: Napped) (No., kg).
  • 6302.21.90 Not napped (under: Other): General 6.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6302.21.90.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.21.90.20 Sheets (361) (under: Not napped) (No., kg).
  • 6302.21.90.30 Bolster cases (360) (under: Not napped) (No., kg).
  • 6302.21.90.40 Pillow covers (369) (under: Not napped) (No., kg).
  • 6302.21.90.50 Other (362) (under: Not napped) (No., kg).
  • 6302.22 Of man-made fibers (under: Other bed linen, printed).
  • 6302.22.10 Containing any embroidery, lace, braid, edging, trimming, piping or applique work: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.22.10.10 Napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.22.10.20 Not napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.22.10.30 Napped (666) (under: Sheets) (No., kg).
  • 6302.22.10.40 Not napped (666) (under: Sheets) (No., kg).
  • 6302.22.10.50 Bolster cases (666) (under: Other) (No., kg).
  • 6302.22.10.60 Other (666) (under: Other) (No., kg).
  • 6302.22.20 Other (under: Of man-made fibers): General 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6302.22.20.10 Pillow cases (666) (under: Other) (No., kg).
  • 6302.22.20.20 Sheets (666) (under: Other) (No., kg).
  • 6302.22.20.30 Other (666) (under: Other) (No., kg).
  • 6302.29.00 Of other textile materials (under: Other bed linen, printed): General 4.5%; Special Free (AU,BH, CL,CO,E*, IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.29.00.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6302.29.00.20 Other (899) (under: Of other textile materials) (No., kg).
  • 6302.31 Of cotton (under: Other bed linen).
  • 6302.31.30 Napped (under: Containing any embroidery, lace, braid, edging, trimming, piping or applique work): General 11.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.31.30.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.31.30.20 Sheets (361) (under: Napped) (No., kg).
  • 6302.31.30.30 Bolster cases (360) (under: Napped) (No., kg).
  • 6302.31.30.40 Pillowcovers (369) (under: Napped) (No., kg).
  • 6302.31.30.50 Other (362) (under: Napped) (No., kg).
  • 6302.31.50 Not napped (under: Containing any embroidery, lace, braid, edging, trimming, piping or applique work): General 20.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.31.50.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.31.50.20 Sheets (361) (under: Not napped) (No., kg).
  • 6302.31.50.30 Bolster cases (360) (under: Not napped) (No., kg).
  • 6302.31.50.40 Pillowcovers (369) (under: Not napped) (No., kg).
  • 6302.31.50.50 Other (362) (under: Not napped) (No., kg).
  • 6302.31.70 Napped (under: Other): General 3.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6302.31.70.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.31.70.20 Sheets (361) (under: Napped) (No., kg).
  • 6302.31.70.30 Bolster cases (360) (under: Napped) (No., kg).
  • 6302.31.70.40 Pillowcovers (369) (under: Napped) (No., kg).
  • 6302.31.70.50 Other (362) (under: Napped) (No., kg).
  • 6302.31.90 Not napped (under: Other): General 6.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6302.31.90.10 Pillowcases, other than bolster cases (360) (No., kg).
  • 6302.31.90.20 Sheets (361) (under: Not napped) (No., kg).
  • 6302.31.90.30 Bolster cases (360) (under: Not napped) (No., kg).
  • 6302.31.90.40 Pillowcovers (369) (under: Not napped) (No., kg).
  • 6302.31.90.50 Other (362) (under: Not napped) (No., kg).
  • 6302.32 Of man-made fibers (under: Other bed linen).
  • 6302.32.10 Containing any embroidery, lace, braid, edging, trimming, piping or applique work: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.32.10.10 Napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.32.10.20 Not napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.32.10.30 Napped (666) (under: Sheets) (No., kg).
  • 6302.32.10.40 Not napped (666) (under: Sheets) (No., kg).
  • 6302.32.10.50 Bolster cases (666) (under: Other) (No., kg).
  • 6302.32.10.60 Other (666) (under: Other) (No., kg).
  • 6302.32.20 Other (under: Of man-made fibers): General 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6302.32.20.10 Napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.32.20.20 Not napped (666) (under: Pillowcases, other than bolster cases) (No., kg).
  • 6302.32.20.30 Napped (666) (under: Sheets) (No., kg).
  • 6302.32.20.40 Not napped (666) (under: Sheets) (No., kg).
  • 6302.32.20.50 Bolster cases (666) (under: Other) (No., kg).
  • 6302.32.20.60 Other (666) (under: Other) (No., kg).
  • 6302.39.00 Of other textile materials (under: Other bed linen): General 4.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.39.00.10 Of wool or fine animal hair (469) (No., kg).
  • 6302.39.00.20 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6302.39.00.30 Other (899) (under: Other) (No., kg).
  • 6302.40 Table linen, knitted or crocheted.
  • 6302.40.10.00 Of vegetable fibers (except cotton) (899) (No., kg): General 6.4%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.40.20 Other (under: Table linen, knitted or crocheted): General 6.8%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.40.20.10 Of cotton (369) (under: Other) (No., kg).
  • 6302.40.20.20 Other (666) (under: Other) (No., kg).
  • 6302.51 Of cotton (under: Other table linen).
  • 6302.51.10.00 Damask (369) (under: Tablecloths and napkins) (No., kg): General 6.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 30%.
  • 6302.51.20.00 Plain woven (369) (under: Other) (No., kg): General 4.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 30%.
  • 6302.51.30.00 Other (369) (under: Other) (No., kg): General 5.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6302.51.40.00 Other (369) (under: Of cotton) (No., kg): General 6.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6302.53.00 Of man-made fibers (under: Other table linen): General 11.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.53.00.10 Damask (666) (under: Tablecloths and napkins) (No., kg).
  • 6302.53.00.20 Other (666) (under: Tablecloths and napkins) (No., kg).
  • 6302.53.00.30 Other (666) (under: Of man-made fibers) (No., kg).
  • 6302.59 Of other textile materials (under: Other table linen).
  • 6302.59.10 Tablecloths and napkins (under: Of flax): General 5.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6302.59.10.10 Damask (899) (under: Tablecloths and napkins) (No., kg).
  • 6302.59.10.20 Other (899) (under: Tablecloths and napkins) (No., kg).
  • 6302.59.20.00 Other (899) (under: Of flax) (No., kg): General Free; Special none; Column 2 90%.
  • 6302.59.30 Other (under: Of other textile materials): General 8.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
  • 6302.59.30.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6302.59.30.20 Other (899) (under: Other) (No., kg).
  • 6302.60.00 Toilet linen and kitchen linen, of terry toweling or similar terry fabrics, of cotton: General 9.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6302.60.00.10 Dish (369) (under: Towels) (No., kg).
  • 6302.60.00.20 Other (363) (under: Towels) (No., kg).
  • 6302.60.00.30 Other (369) (under: Toilet linen and kitchen linen, of terry toweling or similar terry fabrics, of cotton) (No., kg).
  • 6302.91.00 Of cotton (under: Other): General 9.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6302.91.00.05 Dish (369) (under: Towels) (No., kg).
  • 6302.91.00.15 Other (363) (under: Towels) (No., kg).
  • 6302.91.00.25 Other (369) (under: Of pile or tufted construction) (No., kg).
  • 6302.91.00.35 Jacquard figured (363) (under: Towels) (No., kg).
  • 6302.91.00.45 Dish (369) (under: Other) (No., kg).
  • 6302.91.00.50 Other (369) (under: Other) (No., kg).
  • 6302.91.00.60 Other (369) (under: Other) (No., kg).
  • 6302.93 Of man-made fibers (under: Other).
  • 6302.93.10.00 Pile or tufted construction (666) (No., kg): General 6.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 78%.
  • 6302.93.20.00 Other (666) (under: Of man-made fibers) (No., kg): General 9.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6302.99 Of other textile materials (under: Other).
  • 6302.99.10.00 Containing 85 percent or more by weight of silk or silk waste (No., kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6302.99.15 Of flax (under: Of other textile materials): General Free; Special none; Column 2 40%.
  • 6302.99.15.10 Towels (863) (under: Of flax) (No., kg).
  • 6302.99.15.20 Other (899) (under: Of flax) (No., kg).
  • 6302.99.20.00 Other (899) (under: Of other textile materials) (No., kg): General 8.4%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.