HTS Heading 6305

Sacks and bags, of a kind used for the packing of goods

All 10 HTS codes under heading 6305 (sacks and bags), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.4%.

Every line of heading 6305

  • 6305 Sacks and bags, of a kind used for the packing of goods.
  • 6305.10.00.00 Of jute or of other textile bast fibers of heading 5303 (kg): General Free; Special none; Column 2 2.2¢/kg + 10%.
  • 6305.20.00.00 Of cotton (369) (under: Sacks and bags, of a kind used for the packing of goods) (kg): General 6.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6305.32.00 Flexible intermediate bulk containers: General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 103%.
  • 6305.32.00.10 Weighing one kg or more (669) (kg).
  • 6305.32.00.20 Other (669) (under: Flexible intermediate bulk containers) (kg).
  • 6305.33.00 Other, of polyethylene or polypropylene strip or the like: General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 103%.
  • 6305.33.00.10 Weighing one kg or more (669) (kg).
  • 6305.33.00.40 Printed with three or more colors (669) (kg).
  • 6305.33.00.60 Other (669) (under: Weighing less than 1 kg, with an outer laminated ply of plastics sheeting) (kg).
  • 6305.33.00.80 Other (669) (under: Other) (kg).
  • 6305.39.00.00 Other (669) (under: Of man-made textile materials) (kg): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 103%.
  • 6305.90.00.00 Of other textile materials (899) (kg): General 6.2%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.