HTS Heading 6304

Other furnishing articles, excluding those of heading 9404

All 31 HTS codes under heading 6304 (other furnishing articles), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 14.9%.

Every line of heading 6304

  • 6304 Other furnishing articles, excluding those of heading 9404.
  • 6304.11 Knitted or crocheted (under: Bedspreads).
  • 6304.11.10.00 Of cotton (362) (under: Knitted or crocheted) (No., kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.11.20.00 Of man-made fibers (666) (under: Knitted or crocheted) (No., kg): General 6.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6304.11.30.00 Other (899) (under: Knitted or crocheted) (No., kg): General 5.9%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6304.19 Other (under: Bedspreads).
  • 6304.19.05.00 Containing any embroidery, lace, braid, edging, trimming, piping or applique work (362) (No., kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.19.10.00 Other (362) (under: Of cotton) (No., kg): General 4.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 6304.19.15.00 Containing any embroidery, lace, braid, edging, trimming, piping or applique work (666) (No., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.19.20.00 Other (666) (under: Of man-made fibers) (No., kg): General 6.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6304.19.30 Other (under: Other): General 6.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.19.30.30 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6304.19.30.40 Of wool or fine animal hair (469) (No., kg).
  • 6304.19.30.60 Other (899) (under: Other) (No., kg).
  • 6304.20.00 Bed nets specified in subheading note 1 to this chapter: General 5.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.20.00.20 Of cotton (369) (under: Bed nets specified in subheading note 1 to this chapter) (No., kg).
  • 6304.20.00.40 Of man-made fibers (666) (under: Bed nets specified in subheading note 1 to this chapter) (No., kg).
  • 6304.20.00.50 Of wool or fine animal hair (469) (No., kg).
  • 6304.20.00.60 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6304.20.00.70 Other (899) (under: Other) (doz., kg).
  • 6304.91.01 Knitted or crocheted (under: Other): General 5.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.91.01.20 Of cotton (369) (under: Knitted or crocheted) (No., kg).
  • 6304.91.01.40 Of man-made fibers (666) (under: Knitted or crocheted) (No., kg).
  • 6304.91.01.50 Of wool or fine animal hair (469) (No., kg).
  • 6304.91.01.60 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6304.91.01.70 Other (899) (under: Other) (doz., kg).
  • 6304.92.00.00 Not knitted or crocheted, of cotton (369) (No., kg): General 6.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6304.93.00.00 Not knitted or crocheted, of synthetic fibers (666) (No., kg): General 9.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.99 Not knitted or crocheted, of other textile materials.
  • 6304.99.10.00 Certified hand-loomed and folklore products (m2, kg): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6304.99.15.00 Other (469) (under: Wall hangings of wool or fine animal hair) (m2, kg): General 11.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.99.25.00 Wall hangings of jute (under: Of vegetable fibers (except cotton)) (kg): General 11.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6304.99.35.00 Other (899) (under: Of vegetable fibers (except cotton)) (kg): General 11.3%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6304.99.40.00 Certified hand-loomed and folklore pillow covers of wool or fine animal hair (kg): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6304.99.60 Other (under: Other): General 3.2%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6304.99.60.10 Of wool or fine animal hair (469) (kg).
  • 6304.99.60.20 Of artificial fibers (666) (under: Other) (kg).
  • 6304.99.60.30 Containing 85 percent or more by weight of silk or silk waste (kg).
  • 6304.99.60.40 Other (899) (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.