HTS Heading 6307

Other made up articles, including dress patterns

All 38 HTS codes under heading 6307 (other made up articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.9%.

Every line of heading 6307

  • 6307 Other made up articles, including dress patterns.
  • 6307.10 Floorcloths, dishcloths, dusters and similar cleaning cloths.
  • 6307.10.10 Dustcloths, mop cloths and polishing cloths, of cotton: General 4.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 26.2%.
  • 6307.10.10.20 Bar mops (measuring 46 to 57 centimeters in length and 38 to43 centimeters in width) of terry fabric (369) (No., kg).
  • 6307.10.10.90 Other (369) (under: Dustcloths, mop cloths and polishing cloths, of cotton) (kg).
  • 6307.10.20 Other (under: Floorcloths, dishcloths, dusters and similar cleaning cloths): General 5.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6307.10.20.05 Of cotton (369) (under: Shop towels dedicated for use in garages, filling stations and machine shops) (No., kg).
  • 6307.10.20.15 Other (863) (under: Shop towels dedicated for use in garages, filling stations and machine shops) (No., kg).
  • 6307.10.20.27 Of cotton (369) (under: Dish cloths) (No., kg).
  • 6307.10.20.28 Other (863) (under: Dish cloths) (No., kg).
  • 6307.10.20.30 Other (under: Other) (kg).
  • 6307.20.00.00 Lifejackets and lifebelts (under: Other made up articles, including dress patterns) (kg): General 4.5%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 78.5%.
  • 6307.90 Other (under: Other made up articles, including dress patterns).
  • 6307.90.30 Labels (under: Other): General 7.9%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 71.5%.
  • 6307.90.30.10 Of cotton (369) (under: Labels) (kg).
  • 6307.90.30.20 Other (669) (under: Labels) (kg).
  • 6307.90.40 Cords and tassels (under: Other): General Free; Special none; Column 2 65%.
  • 6307.90.40.10 Of cotton (369) (under: Cords and tassels) (kg).
  • 6307.90.40.20 Other (669) (under: Cords and tassels) (kg).
  • 6307.90.50 Corset lacings, footwear lacings or similar lacings: General Free; Special none; Column 2 90%.
  • 6307.90.50.10 Of cotton (369) (under: Corset lacings, footwear lacings or similar lacings) (kg).
  • 6307.90.50.20 Other (669) (under: Corset lacings, footwear lacings or similar lacings) (kg).
  • 6307.90.60 Of fabric formed on a base of paper or covered or lined with paper: General Free; Special none; Column 2 26.5%.
  • 6307.90.60.10 Perineal towels (under: Of fabric formed on a base of paper or covered or lined with paper) (kg).
  • 6307.90.60.90 Other (under: Of fabric formed on a base of paper or covered or lined with paper) (kg).
  • 6307.90.68.00 Spunlaced or bonded fiber fabric disposable surgical drapes of man-made fibers (kg): General Free; Special none; Column 2 78.5%.
  • 6307.90.72.00 Other (under: Other) (kg): General 4.5%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 78.5%.
  • 6307.90.75.00 Toys for pets, of textile materials (No., kg): General 4.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80%.
  • 6307.90.85.00 Wall banners, of man-made fibers (kg): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 6307.90.89 Surgical towels; cotton towels of pile or tufted construction; pillow shells, of cotton; shells for quilts, eiderdowns, comforters and similar articles of cotton: General 7%; Special Free (AU,B,BH, CL,CO,E*,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
  • 6307.90.89.10 Surgical towels (369) (under: Surgical towels; cotton towels of pile or tufted construction; pillow shells, of cotton; shells for quilts, eiderdowns, comforters and similar articles of cotton) (No., kg).
  • 6307.90.89.40 Cotton towels of pile or tufted construction (363) (No., kg).
  • 6307.90.89.45 Pillow shells, of cotton (369) (kg).
  • 6307.90.89.50 Sleeping bag shells (under: Shells for quilts, eiderdowns, comforters and similar articles of cotton) (kg).
  • 6307.90.89.85 Containing 85 percent or more by weight of cotton (No., kg).
  • 6307.90.89.95 Other (362) (under: Other) (No., kg).
  • 6307.90.98 Other (under: Other): General 7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6307.90.98.25 Of the United States (under: National flags) (No., kg).
  • 6307.90.98.35 Of other nations (under: National flags) (No., kg).
  • 6307.90.98.42 Surgical (under: N95 respirators) (No., kg).
  • 6307.90.98.44 Other (under: N95 respirators) (No., kg).
  • 6307.90.98.50 Other respirators (under: Face masks, including respirators without replaceable filters) (No., kg).
  • 6307.90.98.70 Disposable (under: Other face masks) (No., kg).
  • 6307.90.98.75 Other (under: Other face masks) (No., kg).
  • 6307.90.98.82 Other towels of cotton (369) (under: Other) (No., kg).
  • 6307.90.98.84 Other towels of man-made fibers (666) (No., kg).
  • 6307.90.98.85 Furniture movers' pads of cotton (No., kg).
  • 6307.90.98.87 Furniture movers' pads of man-made fibers (No., kg).
  • 6307.90.98.91 Other (under: Other) (No., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.