HTS Heading 6308
Needlecraft sets consisting of woven fabric and yarn, whether or not with accessories, for making up into rugs, tapestries, embroidered tablecloths or napkins, or similar textile articles, put up in packings for retail sale
All 2 HTS codes under heading 6308 (needlecraft sets consisting), with their duty rates from the 2026 HTS Revision 23. General duty 11.4%.
Every line of heading 6308
- 6308.00.00 Needlecraft sets consisting of woven fabric and yarn, whether or not with accessories, for making up into rugs, tapestries, embroidered tablecloths or napkins, or similar textile articles, put up in packings for retail sale: General 11.4%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 55%.
- 6308.00.00.10 Containing wool yarn (469) (under: Needlecraft sets consisting of woven fabric and yarn, whether or not with accessories, for making up into rugs, tapestries, embroidered tablecloths or napkins, or similar textile articles, put up in packings for retail sale) (kg).
- 6308.00.00.20 Other (669) (under: Needlecraft sets consisting of woven fabric and yarn, whether or not with accessories, for making up into rugs, tapestries, embroidered tablecloths or napkins, or similar textile articles, put up in packings for retail sale) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.