HTS Heading 6310

Used or new rags, scrap twine, cordage, rope and cables, and worn out articles of twine, cordage, rope or cables, of textile materials

All 6 HTS codes under heading 6310 (used or new rags), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 6310

  • 6310 Used or new rags, scrap twine, cordage, rope and cables, and worn out articles of twine, cordage, rope or cables, of textile materials.
  • 6310.10 Sorted (under: Used or new rags, scrap twine, cordage, rope and cables, and worn out articles of twine, cordage, rope or cables, of textile materials).
  • 6310.10.10.00 Of wool or fine animal hair (under: Sorted) (kg): General Free; Special none; Column 2 39.7¢/kg.
  • 6310.10.20 Other (under: Sorted): General Free; Special none; Column 2 10%.
  • 6310.10.20.10 Of cotton (under: Other) (kg).
  • 6310.10.20.20 Of man-made fibers (under: Other) (kg).
  • 6310.10.20.30 Other (under: Other) (kg).
  • 6310.90 Other (under: Used or new rags, scrap twine, cordage, rope and cables, and worn out articles of twine, cordage, rope or cables, of textile materials).
  • 6310.90.10.00 Of wool or fine animal hair (under: Other) (kg): General 5.5¢/kg; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 39.7¢/kg.
  • 6310.90.20.00 Other (under: Other) (kg): General Free; Special none; Column 2 10%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.