HTS Heading 6309

Worn clothing and other worn articles

All 2 HTS codes under heading 6309 (worn clothing and other worn articles), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 6309

  • 6309.00.00 Worn clothing and other worn articles: General Free; Special none; Column 2 93%.
  • 6309.00.00.10 Worn clothing (under: Worn clothing and other worn articles) (kg).
  • 6309.00.00.20 Other (under: Worn clothing and other worn articles) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.