HTS Heading 6501
Hat forms, hat bodies and hoods of felt, neither blocked to shape nor with made brims; plateaux and manchons (including slit manchons), of felt
All 3 HTS codes under heading 6501 (hat forms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.3%, some per unit.
Every line of heading 6501
- 6501.00 Hat forms, hat bodies and hoods of felt, neither blocked to shape nor with made brims; plateaux and manchons (including slit manchons), of felt.
- 6501.00.30.00 For men or boys (under: Of fur felt) (doz., kg): General Free; Special none; Column 2 $16/doz. + 25%.
- 6501.00.60.00 Other (under: Of fur felt) (doz., kg): General 96¢/doz. + 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $16/doz. + 25%.
- 6501.00.90.00 Other (459) (under: Hat forms, hat bodies and hoods of felt, neither blocked to shape nor with made brims; plateaux and manchons (including slit manchons), of felt) (No., kg): General 10.3¢/kg + 10.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 88.2¢/kg + 55%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.