HTS Chapter 65
Headgear and parts thereof
The 6 headings and 64 HTS codes of chapter 65 (headgear and parts thereof), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 65
- 6501: Hat forms, hat bodies and hoods of felt, neither blocked to shape nor with made brims; plateaux and manchons (including slit manchons), of felt (3 codes, General duty Free to 10.3%, some per unit)
- 6502: Hat shapes, plaited or made by assembling strips of any material, neither blocked to shape, nor with made brims, not lined, nor trimmed (6 codes, General duty Free to 6.8%, some per unit)
- 6504: Hats and other headgear, plaited or made by assembling strips of any material, whether or not lined or trimmed (6 codes, General duty 4.6% to 6.8%, some per unit)
- 6505: Hats and other headgear, knitted or crocheted, or made up from lace, felt or other textile fabric, in the piece (but not in strips), whether or not lined or trimmed; hair-nets of any material, whether or not lined or trimmed (37 codes, General duty Free to 9.4%, some per unit)
- 6506: Other headgear, whether or not lined or trimmed (11 codes, General duty Free to 8.5%)
- 6507: Headbands, linings, covers, hat foundations, hat frames, peaks (visors) and chin straps, for headgear (1 code, General duty Free)
Where it sits in the schedule
Chapter 65 is in Section XII of the Harmonized System, footwear, headgear and umbrellas (chapters 64 to 67). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.