HTS Heading 6502
Hat shapes, plaited or made by assembling strips of any material, neither blocked to shape, nor with made brims, not lined, nor trimmed
All 6 HTS codes under heading 6502 (hat shapes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.8%, some per unit.
Every line of heading 6502
- 6502.00 Hat shapes, plaited or made by assembling strips of any material, neither blocked to shape, nor with made brims, not lined, nor trimmed.
- 6502.00.20.00 Sewed (under: Of vegetable fibers, of unspun fibrous vegetable materials, of paper yarn or of any combination thereof) (doz., kg): General 34¢/doz. + 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $3/doz. + 50%.
- 6502.00.40.00 Not bleached and not colored (under: Not sewed) (doz., kg): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 6502.00.60 Bleached or colored (under: Not sewed): General Free; Special none; Column 2 25¢/doz. + 25%.
- 6502.00.60.30 Of paper (under: Bleached or colored) (doz.).
- 6502.00.60.60 Other (under: Bleached or colored) (doz., kg).
- 6502.00.90 Other (under: Hat shapes, plaited or made by assembling strips of any material, neither blocked to shape, nor with made brims, not lined, nor trimmed): General 6.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
- 6502.00.90.30 Of man-made fibers (659) (under: Other) (doz., kg).
- 6502.00.90.60 Other (under: Other) (doz., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.