HTS Heading 6506

Other headgear, whether or not lined or trimmed

All 11 HTS codes under heading 6506 (other headgear), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.5%.

Every line of heading 6506

  • 6506 Other headgear, whether or not lined or trimmed.
  • 6506.10 Safety headgear (under: Other headgear, whether or not lined or trimmed).
  • 6506.10.30 Of reinforced or laminated plastics: General Free; Special none; Column 2 $1.10/kg + 40%.
  • 6506.10.30.30 Motorcycle helmets (under: Of reinforced or laminated plastics) (No., kg).
  • 6506.10.30.45 Athletic, recreational and sporting headgear (doz., kg).
  • 6506.10.30.75 Other (under: Other) (doz., kg).
  • 6506.10.60 Other (under: Safety headgear): General Free; Special none; Column 2 25%.
  • 6506.10.60.30 Motorcycle helmets (under: Other) (No., kg).
  • 6506.10.60.45 Athletic, recreational and sporting headgear (doz., kg).
  • 6506.10.60.75 Other (under: Other) (doz., kg).
  • 6506.91.00 Of rubber or plastics (under: Other): General Free; Special none; Column 2 25%.
  • 6506.91.00.30 Bathing caps (under: Of rubber or plastics) (doz., kg).
  • 6506.91.00.45 Visors, or other headgear which provides no covering for the crown of the head (doz., kg).
  • 6506.91.00.60 Other (under: Of rubber or plastics) (doz., kg).
  • 6506.99 Of other materials (under: Other).
  • 6506.99.30.00 Of furskin (under: Of other materials) (doz., kg): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6506.99.60.00 Other (under: Of other materials) (doz., kg): General 8.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.