HTS Heading 6505

Hats and other headgear, knitted or crocheted, or made up from lace, felt or other textile fabric, in the piece (but not in strips), whether or not lined or trimmed; hair-nets of any material, whether or not lined or trimmed

All 37 HTS codes under heading 6505 (hats and other headgear), with their duty rates from the 2026 HTS Revision 23. General duty Free to 9.4%, some per unit.

Every line of heading 6505

  • 6505.00 Hats and other headgear, knitted or crocheted, or made up from lace, felt or other textile fabric, in the piece (but not in strips), whether or not lined or trimmed; hair-nets of any material, whether or not lined or trimmed.
  • 6505.00.01.00 Hair-nets (under: Hats and other headgear, knitted or crocheted, or made up from lace, felt or other textile fabric, in the piece (but not in strips), whether or not lined or trimmed; hair-nets of any material, whether or not lined or trimmed) (kg): General 9.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6505.00.04 Of fur felt (under: Felt hats and other felt headgear, made from the hat bodies, hoods or plateaux of heading 6501, whether or not lined or trimmed): General Free; Special none; Column 2 $16/doz. + 25%.
  • 6505.00.04.10 For men or boys (under: Of fur felt) (doz., kg).
  • 6505.00.04.50 Other (under: Of fur felt) (doz., kg).
  • 6505.00.08.00 Other (under: Felt hats and other felt headgear, made from the hat bodies, hoods or plateaux of heading 6501, whether or not lined or trimmed) (No., kg): General 13.5¢/kg + 6.3% + 1.9¢/article; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 88.2¢/kg + 55% + 12.5¢/ article.
  • 6505.00.15 Knitted (under: Of cotton, flax or both): General 7.9%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,NP,OM,P, PA,PE,S,SG); Column 2 45%.
  • 6505.00.15.15 For babies (239) (under: Of cotton) (doz., kg).
  • 6505.00.15.25 Visors, and other headgear which provides no covering for the crown of the head (359) (doz., kg).
  • 6505.00.15.40 Other (359) (under: Other) (doz., kg).
  • 6505.00.15.60 Other (859) (under: Knitted) (doz., kg).
  • 6505.00.20 Certified hand-loomed and folklore products; and headwear of cotton: General 7.5%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA, NP,OM,P,PA,PE,S,SG); Column 2 37.5%.
  • 6505.00.20.30 For babies (239) (under: Certified hand-loomed and folklore products; and headwear of cotton) (doz., kg).
  • 6505.00.20.60 Other (359) (under: Certified hand-loomed and folklore products; and headwear of cotton) (doz., kg).
  • 6505.00.25 Other (under: Not knitted): General 7.5%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,NP,OM,P, PA,PE,S,SG); Column 2 37.5%.
  • 6505.00.25.45 Visors, and other headgear of cotton which provides no covering for the crown of the head (359) (doz., kg).
  • 6505.00.25.90 Other (859) (under: Other) (doz., kg).
  • 6505.00.30 Knitted or crocheted or made up from knitted or crocheted fabric: General 25.4¢/kg + 7.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 $1.10/kg + 50%.
  • 6505.00.30.30 For babies (439) (under: Knitted or crocheted or made up from knitted or crocheted fabric) (doz., kg).
  • 6505.00.30.45 Visors, and other headgear which provides no covering for the crown of the head (459) (doz., kg).
  • 6505.00.30.90 Other (459) (under: Other) (doz., kg).
  • 6505.00.40 Other (under: Of wool): General 31¢/kg + 7.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 $1.10/kg + 50%.
  • 6505.00.40.30 For babies (439) (under: Other) (doz., kg).
  • 6505.00.40.45 Visors, and other headgear which provides no covering for the crown of the head (459) (doz., kg).
  • 6505.00.40.90 Other (459) (under: Other) (doz., kg).
  • 6505.00.50 Wholly or in part of braid (under: Knitted or crocheted or made up from knitted or crocheted fabric): General 6.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6505.00.50.30 For babies (239) (under: Wholly or in part of braid) (doz., kg).
  • 6505.00.50.45 Visors, and other headgear which provides no covering for the crown of the head (659) (doz., kg).
  • 6505.00.50.90 Other (659) (under: Other) (doz., kg).
  • 6505.00.60 Not in part of braid (under: Knitted or crocheted or made up from knitted or crocheted fabric): General 20¢/kg + 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 99.2¢/kg + 65%.
  • 6505.00.60.30 For babies (239) (under: Not in part of braid) (doz., kg).
  • 6505.00.60.40 Containing 23 percent or more by weight of wool or fine animal hair (459) (doz., kg).
  • 6505.00.60.45 Visors, and other headgear which provides no covering for the crown of the head (659) (doz., kg).
  • 6505.00.60.90 Other (659) (under: Other) (doz., kg).
  • 6505.00.70 Wholly or in part of braid (under: Other): General 6.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6505.00.70.30 For babies (239) (under: Wholly or in part of braid) (doz., kg).
  • 6505.00.70.45 Visors, and other headgear which provides no covering for the crown of the head (659) (doz., kg).
  • 6505.00.70.90 Other (659) (under: Other) (doz., kg).
  • 6505.00.80 Not in part of braid (under: Other): General 18.7¢/kg + 6.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 99.2¢/kg + 65%.
  • 6505.00.80.15 Nonwoven disposable headgear without peaks or visors (doz., kg).
  • 6505.00.80.45 For babies (239) (under: Other) (doz., kg).
  • 6505.00.80.50 Visors, and other headgear which provides no covering for the crown of the head (659) (doz., kg).
  • 6505.00.80.90 Other (659) (under: Other) (doz., kg).
  • 6505.00.90 Other (under: Other): General 20.7¢/kg + 7.5%; Special Free (AU,BH, CL,CO,IL, JO,KR,MA,NP,OM,P, PA,PE,S,SG); Column 2 99.2¢/kg + 65%.
  • 6505.00.90.30 Containing 70 percent or more by weight of silk or silk waste (759) (doz., kg).
  • 6505.00.90.45 Of fine animal hair (459) (under: Other) (doz., kg).
  • 6505.00.90.50 Of paper yarn (under: Other) (doz., kg).
  • 6505.00.90.76 Of unspun vegetable fibers (under: Other) (doz., kg).
  • 6505.00.90.89 Other (859) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.