HTS Heading 6811
Articles of asbestos-cement, of cellulose fiber-cement or the like
All 5 HTS codes under heading 6811 (articles of asbestos-cement), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 6811
- 6811 Articles of asbestos-cement, of cellulose fiber-cement or the like.
- 6811.40.00.00 Containing asbestos (under: Articles of asbestos-cement, of cellulose fiber-cement or the like) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 6811.81.00.00 Corrugated sheets (under: Not containing asbestos) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 6811.82.00.00 Other sheets, panels, tiles and similar articles (kg): General Free; Special none; Column 2 2.2¢/kg.
- 6811.89 Other articles (under: Not containing asbestos).
- 6811.89.10.00 Tubes, pipes and tube or pipe fittings (kg): General Free; Special none; Column 2 1.7¢/kg.
- 6811.89.90.00 Other articles (under: Other articles) (kg): General Free; Special none; Column 2 2.2¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.