HTS Heading 6910
Ceramic sinks, washbasins, washbasin pedestals, baths, bidets, water closet bowls, flush tanks, urinals and similar sanitary fixtures
All 7 HTS codes under heading 6910 (ceramic sinks, washbasins), with their duty rates from the 2026 HTS Revision 23. General duty 5.7% to 5.8%.
Every line of heading 6910
- 6910 Ceramic sinks, washbasins, washbasin pedestals, baths, bidets, water closet bowls, flush tanks, urinals and similar sanitary fixtures.
- 6910.10.00 Of porcelain or china (under: Ceramic sinks, washbasins, washbasin pedestals, baths, bidets, water closet bowls, flush tanks, urinals and similar sanitary fixtures): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 6910.10.00.05 Water closet bowls, flushometer type (No.).
- 6910.10.00.10 Water closet bowls with tanks, in one piece (No.).
- 6910.10.00.15 Flush tanks (under: Of porcelain or china) (No.).
- 6910.10.00.20 Other water closet bowls (under: Of porcelain or china) (No.).
- 6910.10.00.30 Sinks and lavatories (under: Of porcelain or china) (No.).
- 6910.10.00.50 Other (under: Of porcelain or china) (No.).
- 6910.90.00.00 Other (under: Ceramic sinks, washbasins, washbasin pedestals, baths, bidets, water closet bowls, flush tanks, urinals and similar sanitary fixtures) (No.): General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.