HTS Heading 6911

Tableware, kitchenware, other household articles and toilet articles, of porcelain or china

All 18 HTS codes under heading 6911 (tableware, kitchenware), with their duty rates from the 2026 HTS Revision 23. General duty 5.4% to 26%.

Every line of heading 6911

  • 6911 Tableware, kitchenware, other household articles and toilet articles, of porcelain or china.
  • 6911.10 Tableware and kitchenware (under: Tableware, kitchenware, other household articles and toilet articles, of porcelain or china).
  • 6911.10.10.00 Hotel or restaurant ware and other ware not household ware (Dz Pcs): General 25%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.15.00 Valued not over $31.50 per dozen pieces (Dz Pcs): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.25.00 Other (under: Of bone chinaware) (Dz Pcs): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.35 In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is not over $56: General 26%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.35.10 Plates not over 27.9 cm in maximum dimension; teacups and saucers; mugs; soups, fruits and cereals, the foregoing not over 22.9 cm in maximum dimension (Dz Pcs).
  • 6911.10.35.50 Other (under: In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is not over $56) (Dz Pcs).
  • 6911.10.37 Aggregate value not over $200: General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.37.10 Plates not over 27.9 cm in maximum dimension, teacups and saucers; mugs; soups, fruits and cereals, the foregoing not over 22.9 cm in maximum dimension (Dz Pcs).
  • 6911.10.37.50 Other (under: Aggregate value not over $200) (Dz Pcs).
  • 6911.10.38 Aggregate value over $200 (under: In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is over $56): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.38.10 Plates not over 27.9 cm in maximum dimension; teacups and saucers; mugs; soups, fruits and cereals, the foregoing not over 22.9 cm in maximum dimension (Dz Pcs).
  • 6911.10.38.50 Other (under: Aggregate value over $200) (Dz Pcs).
  • 6911.10.41.00 Steins with permanently attached pewter lids, candy boxes, decanters, punch bowls, pretzel dishes, tidbit dishes, tiered servers, bonbon dishes, egg cups, spoons and spoon rests, oil and vinegar sets, tumblers and salt and pepper shaker sets (Dz Pcs): General 6.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
  • 6911.10.45.00 Mugs and other steins (under: Other) (Dz Pcs): General 14%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
  • 6911.10.52.00 Cups valued over $8 but not over $29 per dozen; saucers valued over $5.25 but not over $18.75 per dozen; soups, oatmeals and cereals valued over $9.30 but not over $33 per dozen; plates not over 22.9 cm in maximum diameter and valued over $8.50 but not over $31 per dozen; plates over 22.9 but not over 27.9 cm in maximum diameter and valued over $11.50 but not over $41 per dozen; platters or chop dishes valued over $40 but not over $143 per dozen; sugars valued over $23 but not over $85 per dozen; creamers valued over $20 but not over $75 per dozen; and beverage servers valued over $50 but not over $180 per dozen (Dz Pcs): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.58.00 Cups valued over $29 per dozen; saucers valued over $18.75 per dozen; soups, oatmeals and cereals valued over $33 per dozen; plates not over 22.9 cm in maximum diameter and valued over $31 per dozen; plates over 22.9 but not over 27.9 cm in maximum diameter and valued over $41 per dozen; platters or chop dishes valued over $143 per dozen; sugars valued over $85 per dozen; creamers valued over $75 per dozen; and beverage servers valued over $180 per dozen (Dz Pcs): General 6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.60.00 Serviette rings (under: Other) (Dz Pcs): General 20.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.80 Other (under: Other): General 20.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 6911.10.80.10 Suitable for food or drink contact (Dz Pcs).
  • 6911.10.80.90 Other (under: Other) (Dz Pcs).
  • 6911.90.00 Other (under: Tableware, kitchenware, other household articles and toilet articles, of porcelain or china): General 5.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
  • 6911.90.00.10 Toilet articles (under: Other) (No.).
  • 6911.90.00.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.