HTS Heading 7002

Glass in balls (other than microspheres of heading 7018), rods or tubes, unworked

All 8 HTS codes under heading 7002 (glass in balls), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.

Every line of heading 7002

  • 7002 Glass in balls (other than microspheres of heading 7018), rods or tubes, unworked.
  • 7002.10 Balls (under: Glass in balls (other than microspheres of heading 7018), rods or tubes, unworked).
  • 7002.10.10.00 Not over 6 mm in diameter (under: Balls) (kg): General 3.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7002.10.20.00 Other (under: Balls) (kg): General Free; Special none; Column 2 55%.
  • 7002.20 Rods (under: Glass in balls (other than microspheres of heading 7018), rods or tubes, unworked).
  • 7002.20.10.00 Of fused quartz or other fused silica (kg): General Free; Special none; Column 2 40%.
  • 7002.20.50.00 Other (under: Rods) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7002.31.00.00 Of fused quartz or other fused silica (kg): General Free; Special none; Column 2 40%.
  • 7002.32.00.00 Of other glass having a linear coefficient of expansion not exceeding 5 x 10-6 per Kelvin within a temperature range of 0˚C to 300˚C (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7002.39.00 Other (under: Tubes): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7002.39.00.10 Of a length not exceeding 200 mm (No.).
  • 7002.39.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.