HTS Heading 7001
Cullet and other waste and scrap of glass, excluding glass from cathode-ray tubes or other activated glass of heading 8549; glass in the mass
All 3 HTS codes under heading 7001 (cullet and other waste and scrap of glass), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 7001
- 7001.00 Cullet and other waste and scrap of glass, excluding glass from cathode-ray tubes or other activated glass of heading 8549; glass in the mass.
- 7001.00.10.00 Of fused quartz or other fused silica (kg): General Free; Special none; Column 2 30%.
- 7001.00.20.00 Other (under: Glass in the mass) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7001.00.51.00 Other (under: Cullet and other waste and scrap of glass, excluding glass from cathode-ray tubes or other activated glass of heading 8549; glass in the mass) (kg): General Free; Special none; Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.