HTS Heading 7004

Drawn glass and blown glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked

All 16 HTS codes under heading 7004 (drawn glass), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.2%, some per unit.

Every line of heading 7004

  • 7004 Drawn glass and blown glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked.
  • 7004.20 Glass, colored throughout the mass (body tinted), opacified, flashed or having an absorbent, reflecting or non-reflecting layer.
  • 7004.20.10.00 Having an absorbent, reflecting or non-reflecting layer (m2): General Free; Special none; Column 2 60%.
  • 7004.20.20 In rectangular shape (under: Other): General 1¢/kg + 1.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.2¢/kg + 5%.
  • 7004.20.20.10 Measuring less than 5 mm in thickness (m2, kg).
  • 7004.20.20.20 Measuring 5 mm and over in thickness (m2, kg).
  • 7004.20.50.00 Other (under: Other) (m2): General 7.2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7004.90 Other glass (under: Drawn glass and blown glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked).
  • 7004.90.05.00 Measuring not over 0.26 m2 in area (m2, kg): General Free; Special none; Column 2 3.3¢/kg.
  • 7004.90.10.00 Measuring over 0.26 m2 in area (m2, kg): General Free; Special none; Column 2 4.2¢/kg.
  • 7004.90.15.00 Measuring not over 0.26 m2 in area (m2, kg): General Free; Special none; Column 2 4.6¢/kg.
  • 7004.90.20.00 Measuring over 0.26 m2 in area (m2, kg): General Free; Special none; Column 2 5.5¢/kg.
  • 7004.90.25 Measuring over 2 but not over 3.5 mm in thickness: General 0.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.3¢/kg.
  • 7004.90.25.10 Measuring not over 0.26 m2 in area (m2, kg).
  • 7004.90.25.20 Measuring over 0.26 but not over 0.58 m2 in area (m2, kg).
  • 7004.90.25.50 Measuring over 0.58 m2 in area (m2, kg).
  • 7004.90.30 Measuring not over 0.65 m2 in area: General Free; Special none; Column 2 3.3¢/kg.
  • 7004.90.30.10 Measuring over 3.5 but not over 5 mm in thickness (m2, kg).
  • 7004.90.30.20 Measuring over 5 mm in thickness (m2, kg).
  • 7004.90.30.50 Measuring over 0.26 but not over 0.65 m2 in area (m2, kg).
  • 7004.90.40.00 Measuring over 0.65 m2 in area (m2, kg): General Free; Special none; Column 2 5.3¢/kg.
  • 7004.90.50.00 Other (under: Other glass) (m2): General 5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.