HTS Heading 7005

Float glass and surface ground or polished glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked

All 15 HTS codes under heading 7005 (float glass), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.6%, some per unit.

Every line of heading 7005

  • 7005 Float glass and surface ground or polished glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked.
  • 7005.10 Nonwired glass, having an absorbent, reflecting or non-reflecting layer.
  • 7005.10.40.00 Suitable for use in liquid crystal displays, measuring not over 1.2 mm in thickness and not over 0.8 m2 in area (m2): General Free; Special none; Column 2 60%.
  • 7005.10.80.00 Other (under: Nonwired glass, having an absorbent, reflecting or non-reflecting layer) (m2): General 4.4%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7005.21 Colored throughout the mass (body tinted), opacified, flashed or merely surface ground.
  • 7005.21.10 Measuring less than 10 mm in thickness: General 14.5¢/m2 + 0.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $2.13/m2 + 5%.
  • 7005.21.10.10 Measuring less than 5 mm in thickness (m2).
  • 7005.21.10.30 Measuring 5 mm or more but less than 10 mm in thickness (m2).
  • 7005.21.20.00 Measuring 10 mm or more in thickness (m2): General 5.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 55%.
  • 7005.29 Other (under: Other nonwired glass).
  • 7005.29.04 Suitable for use in liquid crystal displays: General Free; Special none; Column 2 $1.35/m2.
  • 7005.29.04.10 Measuring not over 0.26 m2 in area (m2).
  • 7005.29.04.50 Measuring over 0.26 m2 but not over 0.65 m2 in area (m2).
  • 7005.29.08 Other (under: Measuring not over 0.65 m in area): General 18.7¢/m2; Special Free (A+,AU,B,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 $1.35/m2.
  • 7005.29.08.10 Measuring not over 0.26 m2 in area (m2).
  • 7005.29.08.50 Measuring over 0.26 m2 but not over 0.65 m2 in area (m2).
  • 7005.29.14 Suitable for use in liquid crystal displays, measuring not over 0.8 m2 in area: General Free; Special none; Column 2 $2.13/m2.
  • 7005.29.14.10 Measuring less than 5 mm in thickness (m2).
  • 7005.29.14.50 Measuring 5 mm or more but less than 10 mm in thickness (m2).
  • 7005.29.18 Other (under: Measuring over 0.65 m2 in area): General 14.5¢/m2; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $2.13/m2.
  • 7005.29.18.10 Measuring less than 5 mm in thickness (m2).
  • 7005.29.18.50 Measuring 5 mm or more but less than 10 mm in thickness (m2).
  • 7005.29.25.00 Measuring 10 mm or more in thickness (m2): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7005.30.00.00 Wired glass (under: Float glass and surface ground or polished glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked) (m2): General 29.1¢/m2; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2.48/m2.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.