HTS Heading 7007
Safety glass, consisting of toughened (tempered) or laminated glass
All 7 HTS codes under heading 7007 (safety glass), with their duty rates from the 2026 HTS Revision 23. General duty 4.9% to 5.5%.
Every line of heading 7007
- 7007 Safety glass, consisting of toughened (tempered) or laminated glass.
- 7007.11.00 Of size and shape suitable for incorporation in vehicles, aircraft, spacecraft or vessels: General 5.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7007.11.00.10 For motor vehicles of chapter 87 (m2).
- 7007.11.00.90 Other (under: Of size and shape suitable for incorporation in vehicles, aircraft, spacecraft or vessels) (m2).
- 7007.19.00.00 Other (under: Toughened (tempered) safety glass) (m2): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7007.21 Of size and shape suitable for incorporation in vehicles, aircraft, spacecraft or vessels.
- 7007.21.11 Windshields (under: Of size and shape suitable for incorporation in vehicles, aircraft, spacecraft or vessels): General 4.9%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7007.21.11.10 For motor vehicles of chapter 87 (m2).
- 7007.21.11.90 Other (under: Windshields) (m2).
- 7007.21.51.00 Other (under: Of size and shape suitable for incorporation in vehicles, aircraft, spacecraft or vessels) (m2): General 4.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7007.29.00.00 Other (under: Laminated safety glass) (m2): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.