HTS Heading 7006
Glass of heading 7003, 7004 or 7005, bent, edge-worked, engraved, drilled, enameled or otherwise worked, but not framed or fitted with other materials
All 4 HTS codes under heading 7006 (glass of heading 7003, 7004 or 7005), with their duty rates from the 2026 HTS Revision 23. General duty 4.9% to 8.8%.
Every line of heading 7006
- 7006.00 Glass of heading 7003, 7004 or 7005, bent, edge-worked, engraved, drilled, enameled or otherwise worked, but not framed or fitted with other materials.
- 7006.00.10.00 Strips not over 15.2 cm in width, measuring over 2 mm in thickness, and having all longitudinal edges ground or otherwise smoothed or processed (m2): General 8.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 53%.
- 7006.00.20.00 Glass, drawn or blown and not containing wire netting and not surface ground or polished (m2): General 6.4%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7006.00.40 Other (under: Other): General 4.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7006.00.40.10 Having an absorbent or reflecting layer (m2).
- 7006.00.40.50 Other (under: Other) (m2).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.