HTS Heading 7009

Glass mirrors, whether or not framed, including rear-view mirrors

All 11 HTS codes under heading 7009 (glass mirrors, whether or not framed), with their duty rates from the 2026 HTS Revision 23. General duty 3.9% to 7.8%.

Every line of heading 7009

  • 7009 Glass mirrors, whether or not framed, including rear-view mirrors.
  • 7009.10.00.00 Rear-view mirrors for vehicles (No.): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7009.91 Unframed (under: Other).
  • 7009.91.10 Not over 929 cm2 in reflecting area: General 7.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7009.91.10.10 Containing LED or fluorescent lighting (cm2, No.).
  • 7009.91.10.90 Other (under: Not over 929 cm2 in reflecting area) (cm2, No.).
  • 7009.91.50 Over 929 cm2 in reflecting area: General 6.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.25% (JP); Column 2 45%.
  • 7009.91.50.10 Containing LED or fluorescent lighting (cm2, No.).
  • 7009.91.50.91 Over-the-door mirrors of a kind described in statistical note 2 to this chapter (cm2, No.).
  • 7009.91.50.95 Other (under: Other) (cm2, No.).
  • 7009.92 Framed (under: Other).
  • 7009.92.10 Not over 929 cm2 in reflecting area: General 7.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7009.92.10.10 Containing LED or fluorescent lighting (cm2, No.).
  • 7009.92.10.90 Other (under: Not over 929 cm2 in reflecting area) (cm2, No.).
  • 7009.92.50 Over 929 cm2 in reflecting area: General 6.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.25% (JP); Column 2 45%.
  • 7009.92.50.10 Containing LED or fluorescent lighting (cm2, No.).
  • 7009.92.50.91 Over-the-door mirrors of a kind described in statistical note 2 to this chapter (cm2, No.).
  • 7009.92.50.95 Other (under: Other) (cm2, No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.