HTS Heading 7010

Carboys, bottles, flasks, jars, pots, vials, ampoules and other containers, of glass, of a kind used for the conveyance or packing of goods; preserving jars of glass; stoppers, lids and other closures, of glass

All 26 HTS codes under heading 7010 (carboys, bottles, flasks, jars, pots), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.2%.

Every line of heading 7010

  • 7010 Carboys, bottles, flasks, jars, pots, vials, ampoules and other containers, of glass, of a kind used for the conveyance or packing of goods; preserving jars of glass; stoppers, lids and other closures, of glass.
  • 7010.10.00.00 Ampoules (under: Carboys, bottles, flasks, jars, pots, vials, ampoules and other containers, of glass, of a kind used for the conveyance or packing of goods; preserving jars of glass; stoppers, lids and other closures, of glass) (gross): General Free; Special none; Column 2 50¢/gross.
  • 7010.20 Stoppers, lids and other closures.
  • 7010.20.20.00 Produced by automatic machine (gross): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 7010.20.30.00 Other (under: Stoppers, lids and other closures) (gross): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 7010.90 Other (under: Carboys, bottles, flasks, jars, pots, vials, ampoules and other containers, of glass, of a kind used for the conveyance or packing of goods; preserving jars of glass; stoppers, lids and other closures, of glass).
  • 7010.90.05 Serum bottles, vials and other pharmaceutical containers: General Free; Special none; Column 2 50¢/gross.
  • 7010.90.05.10 Of a capacity exceeding 1 liter (gross).
  • 7010.90.05.20 Of a capacity exceeding 0.33 liter but not exceeding 1 liter (gross).
  • 7010.90.05.30 Of a capacity exceeding 0.15 liter but not exceeding 0.33 liter (gross).
  • 7010.90.05.40 Of a capacity not exceeding 0.15 liter (gross).
  • 7010.90.20 Produced by automatic machine: General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 7010.90.20.10 Of a capacity exceeding 1 liter (gross).
  • 7010.90.20.20 Of a capacity exceeding 0.33 liter but not exceeding 1 liter (gross).
  • 7010.90.20.30 Of a capacity exceeding 0.15 liter but not exceeding 0.33 liter (gross).
  • 7010.90.20.40 Of a capacity not exceeding 0.15 liter (gross).
  • 7010.90.30 Other (under: Containers (with or without their closures) of a kind used for the conveyance or packing of perfume or other toilet preparations; other containers if fitted with or designed for use with ground glass stoppers): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 7010.90.30.10 Of a capacity exceeding 1 liter (gross).
  • 7010.90.30.20 Of a capacity exceeding 0.33 liter but not exceeding 1 liter (gross).
  • 7010.90.30.30 Of a capacity exceeding 0.15 liter but not exceeding 0.33 liter (gross).
  • 7010.90.30.40 Of a capacity not exceeding 0.15 liter (gross).
  • 7010.90.50 Other containers (with or without their closures): General Free; Special none; Column 2 4.9%.
  • 7010.90.50.05 Having a mouth with an outer diameter of 38 mm or more (gross).
  • 7010.90.50.09 Other (under: Of a capacity exceeding 1 liter) (gross).
  • 7010.90.50.15 Having a mouth with an outer diameter of 38 mm or more (gross).
  • 7010.90.50.19 Other (under: Of a capacity exceeding 0.473 liter but not exceeding 1 liter) (gross).
  • 7010.90.50.25 Having a mouth with an outer diameter of 38 mm or more (gross).
  • 7010.90.50.29 Other (under: Of a capacity exceeding 0.33 liter but not exceeding 0.473 liter) (gross).
  • 7010.90.50.35 Having a mouth with an outer diameter of 38 mm or more (gross).
  • 7010.90.50.39 Other (under: Of a capacity exceeding 0.15 liter but not exceeding 0.33 liter) (gross).
  • 7010.90.50.45 Having a mouth with an outer diameter of 38 mm or more (gross).
  • 7010.90.50.49 Other (under: Of a capacity exceeding 0.118 liter but not exceeding 0.15 liter) (gross).
  • 7010.90.50.55 Of a capacity not exceeding 0.118 liter (gross).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.